That which could have turned into “another drab stretch … of bureaucratic architecture” has become what Washington Post architecture critic Philip Kennicott has called “a rare example of urban jazz” in the District of Columbia.
The project team behind Midtown Center demolished four buildings (including the Post's one-time headquarters) at night and erected a hip duo of 14-story, copper-clad towers accented by three enclosed bridges mounted over a 10,000-sf pedestrian way/courtyard. Bureaucratic architecture, be damned!
Credit developer Carr Properties for being hip enough to: 1) give up 50,000 sf of density to create the courtyard; 2) resist the temptation to build yet another mundane box, and 3) commission a nimble-fingered combo to orchestrate the work: Clark Construction (GC), SHoP Architects (designer), WDG Architects (AOR), and SK&A Structural Engineering.
Together, they charted a LEED Gold riff of 786,000 sf of office space 44,000 sf of retail, and a 32,000-sf penthouse. The location couldn’t be sweeter: Midtown Center is just a short stroll to the White House, two Metro stations, and the K Street power corridor.
Clark brought in Oldcastle BuildingEnvelope as design-assist partner with ShoP Architects on the curtain wall. Along with glass manufacturer Tvitec, they created a distinctive glass enclosure with copper louvers that cuts solar glare by 50% and solar heat gain by 18%.
Clark, Berlin Steel, and SK&A coordinated to design and fabricate the 50-ton, 110-foot-long bridges. Clark Foundations crafted a steel platform to support the 550-ton crane needed to lift the 45,000-pound steel chords for the spans. Oldcastle implemented a monorail system to install the glass on the overhead tunnels.
Mortgage lender Fannie Mae took one entire tower and most of the other one; WeWork grabbed 109,943 sf of the limited remaining space.+
Building Team — Submitting firm Clark Construction Group (CM), Owner Carr Properties, Architect SHoP Architects, AOR WDG Architecture, SE SK&A Structural Engineering, MEP Engineer Girard, Design-assist envelope consultant Oldcastle Building Envelope, Steel fabricator Berlin Steel
General information — Size 1,150,000 sf, Construction cost $243 million, Construction time December 2015 to November 2017 (phase 1); November 2017 to May 2018 (phase 2), Delivery method Design-bid-build
Return to the Building Team Awards landing page
Related Stories
Building Team Awards | May 21, 2018
Campus builder: Everett University Center at Washington State University
Silver Award: WSU kicks off its new branch campus with a high-tech innovation center designed to engage students, businesses, and the community.
Building Team Awards | May 21, 2018
Promise fulfilled: Park West, Texas A&M University
Silver Award: A P3-driven team completes this mega off-campus student housing complex ahead of its fast-track schedule.
Building Team Awards | May 18, 2018
Prognosis: Positive: Rutgers University-Camden Nursing and Science Building
Gold Award: Can a new nursing school breathe life into America’s third-poorest city?
Building Team Awards | May 17, 2018
Patient priorities: Cleveland Clinic Taussig Cancer Center
Gold Award: Cleveland Clinic’s new cancer center is a transparent, collaborative hub for improved patient experiences and enhanced communication with caregivers.
Building Team Awards | May 16, 2018
Game, set, match: United States Tennis Association National Campus
Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.
Building Team Awards | May 15, 2018
High court, big impact: San Diego Central Courthouse
Gold Award: San Diego’s high-rise courthouse increases access to justice for citizens by consolidating 71 court departments.
Building Team Awards | May 14, 2018
Sweat equity marks landscaping effort
The design was grounded in therapeutic landscape and environmental psychology theory.
Building Team Awards | May 14, 2018
Rethinking prison design: Iowa Correctional Institution for Women
Platinum Award: Iowa's new women's correctional institution offers a revolutionary model for rehabilitating female inmates.
Building Team Awards | May 14, 2018
Dream delivered: McCormick Square Marriott Marquis and Wintrust Arena
Platinum Award: A daring hotel and sports development in Chicago’s South Loop aims to invigorate the city’s convention business.
Building Team Awards | Jun 14, 2017
17 projects earn BD+C's 2017 Building Team Awards
Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.