That which could have turned into “another drab stretch … of bureaucratic architecture” has become what Washington Post architecture critic Philip Kennicott has called “a rare example of urban jazz” in the District of Columbia.
The project team behind Midtown Center demolished four buildings (including the Post's one-time headquarters) at night and erected a hip duo of 14-story, copper-clad towers accented by three enclosed bridges mounted over a 10,000-sf pedestrian way/courtyard. Bureaucratic architecture, be damned!
Credit developer Carr Properties for being hip enough to: 1) give up 50,000 sf of density to create the courtyard; 2) resist the temptation to build yet another mundane box, and 3) commission a nimble-fingered combo to orchestrate the work: Clark Construction (GC), SHoP Architects (designer), WDG Architects (AOR), and SK&A Structural Engineering.
Together, they charted a LEED Gold riff of 786,000 sf of office space 44,000 sf of retail, and a 32,000-sf penthouse. The location couldn’t be sweeter: Midtown Center is just a short stroll to the White House, two Metro stations, and the K Street power corridor.
Clark brought in Oldcastle BuildingEnvelope as design-assist partner with ShoP Architects on the curtain wall. Along with glass manufacturer Tvitec, they created a distinctive glass enclosure with copper louvers that cuts solar glare by 50% and solar heat gain by 18%.
Clark, Berlin Steel, and SK&A coordinated to design and fabricate the 50-ton, 110-foot-long bridges. Clark Foundations crafted a steel platform to support the 550-ton crane needed to lift the 45,000-pound steel chords for the spans. Oldcastle implemented a monorail system to install the glass on the overhead tunnels.
Mortgage lender Fannie Mae took one entire tower and most of the other one; WeWork grabbed 109,943 sf of the limited remaining space.+
Building Team — Submitting firm Clark Construction Group (CM), Owner Carr Properties, Architect SHoP Architects, AOR WDG Architecture, SE SK&A Structural Engineering, MEP Engineer Girard, Design-assist envelope consultant Oldcastle Building Envelope, Steel fabricator Berlin Steel
General information — Size 1,150,000 sf, Construction cost $243 million, Construction time December 2015 to November 2017 (phase 1); November 2017 to May 2018 (phase 2), Delivery method Design-bid-build
Return to the Building Team Awards landing page
Related Stories
Building Team Awards | Jun 14, 2017
3D-printed office: Office of the Future
Dubai kicks off 3D-printing tech initiative with a novel office project.
Building Team Awards | Jun 14, 2017
A space for all: Lighthouse for the Blind and Visually Impaired
Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.
Building Team Awards | Jun 13, 2017
Government campus reimagined: Intelligence Community Campus
Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.
Building Team Awards | Jun 13, 2017
Secluded sanctuary: Alnoba leadership training center
Leadership training center becomes New England’s first Passive House building.
Building Team Awards | Jun 12, 2017
Circles and squares: Faena Arts Center
Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.
Building Team Awards | Jun 12, 2017
The right prescription: University of North Dakota School of Medicine & Health Sciences
Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.
Building Team Awards | Jun 12, 2017
Texas technopark: TechnipFMC John T. Gremp Campus
Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.
Building Team Awards | Jun 8, 2017
Quick turnaround: Partners HealthCare
Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.
Building Team Awards | Jun 8, 2017
Raising the bar: Zurich North American Headquarters
Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.
Building Team Awards | Jun 8, 2017
Team win: Clemson University Allen N. Reeves Football Operations Complex
Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.