Scottsdale, Ariz.-based Martens Development recently broke ground on The Brickyards on Ellsworth, an eight-building, 909,553-sf Class A industrial facility development in Mesa.
A construction team led by FCL Builders will deliver move-in-ready spaces for what is one of the more active industrial submarkets in the U.S. Ware Malcomb designed the buildings that will range in size from 35,000 to 250,000 sf. The building team includes Hunter Engineering and TLCP (SE), and Peterson Associates (MEP). CBRE is managing the leasing.
Martens has been developing projects in Mesa for eight years, according to its Principal David Martens. “A lot of businesses are coming from California, Oregon, Washington, Utah … because we have a friendly business environment.” One of the developer’s recent projects is The Landing, a 10-building complex that was completed in 2022.
Phoenix leads in industrial facility building
According to CommercialEdge data, Phoenix is the most active industrial construction market in the country, with 42.7 million sf underway, representing 11.1 percent of that market’s stock. As of the third quarter of 2023, more than 15 million sf of industrial space were under construction in Southeast Mesa, according to reporting by the Phoenix Business Journal.
The 63-acre Brickyards on Ellsworth, with an estimated price tag of $153.6 million, is located near the Phoenix-Mesa Gateway Airport within the Pecos Advanced Manufacturing Zone and near the SRP 69kV transmission line. That proximity ensures ample available power to tenants, according to city officials. The development is also in a designated Foreign Trading Zone that reduces or defers tariffs and duties on products produced in the zone, and could also reduce qualified users’ property taxes.
The Brickyards on Ellsworth will offer a mix of specification and build-to-suit options, with each building featuring about 10 percent office space. When The Brickyards on Ellsworth is completed in the summer of 2025, Martens Development’s industrial portfolio will exceed 5 million sf. (While the eighth building in the Brickyards on Ellsworth complex is planned, there’s no timeline yet on when it will be started.)
Related Stories
| Jul 28, 2014
Reconstruction Sector Construction Firms [2014 Giants 300 Report]
Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Engineering Firms [2014 Giants 300 Report]
Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Architecture Firms [2014 Giants 300 Report]
Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 27, 2014
Maturing ‘plug and play’ sector could take market share from AEC Giants [2014 Giants 300 Report]
The growth of modular and containerized data center solutions may eventually hinder the growth of traditional data center construction services.
| Jul 27, 2014
Top Data Center Construction Firms [2014 Giants 300 Report]
Holder, Turner, and DPR head Building Design+Construction's 2014 ranking of the largest data center contractors and construction management firms in the U.S.
| Jul 27, 2014
Top Data Center Engineering Firms [2014 Giants 300 Report]
Fluor, Jacobs, and Syska Hennessy top Building Design+Construction's 2014 ranking of the largest data center engineering and engineering/architecture firms in the U.S.
| Jul 27, 2014
Top Data Center Architecture Firms [2014 Giants 300 Report]
Gensler, Corgan, and HDR head Building Design+Construction's 2014 ranking of the largest data center architecture and architecture/engineering firms in the U.S.
| Jul 23, 2014
Architecture Billings Index up nearly a point in June
AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.
| Jul 21, 2014
Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]
According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.
| Jul 18, 2014
Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]
“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.