Scottsdale, Ariz.-based Martens Development recently broke ground on The Brickyards on Ellsworth, an eight-building, 909,553-sf Class A industrial facility development in Mesa.
A construction team led by FCL Builders will deliver move-in-ready spaces for what is one of the more active industrial submarkets in the U.S. Ware Malcomb designed the buildings that will range in size from 35,000 to 250,000 sf. The building team includes Hunter Engineering and TLCP (SE), and Peterson Associates (MEP). CBRE is managing the leasing.
Martens has been developing projects in Mesa for eight years, according to its Principal David Martens. “A lot of businesses are coming from California, Oregon, Washington, Utah … because we have a friendly business environment.” One of the developer’s recent projects is The Landing, a 10-building complex that was completed in 2022.
Phoenix leads in industrial facility building
According to CommercialEdge data, Phoenix is the most active industrial construction market in the country, with 42.7 million sf underway, representing 11.1 percent of that market’s stock. As of the third quarter of 2023, more than 15 million sf of industrial space were under construction in Southeast Mesa, according to reporting by the Phoenix Business Journal.
The 63-acre Brickyards on Ellsworth, with an estimated price tag of $153.6 million, is located near the Phoenix-Mesa Gateway Airport within the Pecos Advanced Manufacturing Zone and near the SRP 69kV transmission line. That proximity ensures ample available power to tenants, according to city officials. The development is also in a designated Foreign Trading Zone that reduces or defers tariffs and duties on products produced in the zone, and could also reduce qualified users’ property taxes.
The Brickyards on Ellsworth will offer a mix of specification and build-to-suit options, with each building featuring about 10 percent office space. When The Brickyards on Ellsworth is completed in the summer of 2025, Martens Development’s industrial portfolio will exceed 5 million sf. (While the eighth building in the Brickyards on Ellsworth complex is planned, there’s no timeline yet on when it will be started.)
Related Stories
| May 22, 2014
Facebook, Telus push the limits of energy efficiency with new data centers
Building Teams are employing a range of creative solutions—from evaporative cooling to novel hot/cold-aisle configurations to heat recovery schemes—in an effort to slash energy and water demand.
| May 22, 2014
7 ways it pays to use BIM for data centers
Here’s where AEC firms and owners are getting the most bang for the buck when using BIM/VDC to coordinate data center projects.
| May 22, 2014
Big Data meets data centers – What the coming DCIM boom means to owners and Building Teams
The demand for sophisticated facility monitoring solutions has spurred a new market segment—data center infrastructure management (DCIM)—that is likely to impact the way data center projects are planned, designed, built, and operated.
| May 20, 2014
Kinetic Architecture: New book explores innovations in active façades
The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.
| May 19, 2014
What can architects learn from nature’s 3.8 billion years of experience?
In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| Apr 29, 2014
Best of Canada: 12 projects nab nation's top architectural prize [slideshow]
The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.