Scottsdale, Ariz.-based Martens Development recently broke ground on The Brickyards on Ellsworth, an eight-building, 909,553-sf Class A industrial facility development in Mesa.
A construction team led by FCL Builders will deliver move-in-ready spaces for what is one of the more active industrial submarkets in the U.S. Ware Malcomb designed the buildings that will range in size from 35,000 to 250,000 sf. The building team includes Hunter Engineering and TLCP (SE), and Peterson Associates (MEP). CBRE is managing the leasing.
Martens has been developing projects in Mesa for eight years, according to its Principal David Martens. “A lot of businesses are coming from California, Oregon, Washington, Utah … because we have a friendly business environment.” One of the developer’s recent projects is The Landing, a 10-building complex that was completed in 2022.
Phoenix leads in industrial facility building
According to CommercialEdge data, Phoenix is the most active industrial construction market in the country, with 42.7 million sf underway, representing 11.1 percent of that market’s stock. As of the third quarter of 2023, more than 15 million sf of industrial space were under construction in Southeast Mesa, according to reporting by the Phoenix Business Journal.
The 63-acre Brickyards on Ellsworth, with an estimated price tag of $153.6 million, is located near the Phoenix-Mesa Gateway Airport within the Pecos Advanced Manufacturing Zone and near the SRP 69kV transmission line. That proximity ensures ample available power to tenants, according to city officials. The development is also in a designated Foreign Trading Zone that reduces or defers tariffs and duties on products produced in the zone, and could also reduce qualified users’ property taxes.
The Brickyards on Ellsworth will offer a mix of specification and build-to-suit options, with each building featuring about 10 percent office space. When The Brickyards on Ellsworth is completed in the summer of 2025, Martens Development’s industrial portfolio will exceed 5 million sf. (While the eighth building in the Brickyards on Ellsworth complex is planned, there’s no timeline yet on when it will be started.)
Related Stories
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 26, 2014
First look: Lockheed Martin opens Advanced Materials and Thermal Sciences Center in Palo Alto
The facility will host advanced R&D in emerging technology areas like 3D printing, energetics, thermal sciences, and nanotechnology.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
Fluor defines the future 7D deliverable without losing sight of real results today
A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation.
| Mar 19, 2014
Frames: the biggest value engineering tip
In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.
| Mar 7, 2014
Chicago's 7 most threatened buildings: Guyon Hotel, Jeffrey Theater make the list
The 2014 edition of Preservation Chicago's annual Chicago's 7 list includes an L station house, public school, theater, manufacturing district, power house, and hotel.