Having little experience with the ARRIS.tile product, the architect for this project was educated on the Arriscraft line by Brickstone Inc. (which represents the stone company in Colorado, Utah, Wyoming and Idaho). Jason Evans, Construction & Marketing Manager at Scott P. Evans, says, ”After spending some time with the local product rep, we saw the value in incorporating ARRIS.tile into our job. The color options were great, working with a thin material was advantageous for our specific job, and the quality, durability and warranty sold us on the product. On the appropriate project we would definitely use ARRIS.tile again. We’ve already recommended it to other architects searching for this type of product.”
ProGUARDTM- An exciting, continuous insulation solution for thin adhered masonry industry
While naturally-made ARRIS.tile was used for the stunning cladding material, the wall system itself was revolutionary for the thin-adhered veneer market. In addition to using the Laticrete Masonry Veneer Installation System (MVIS) to adhere the units and waterproof the assembly, the designers also chose to use the ProGUARDTM insulated cement board panels as well. These panels are constructed by laminating ¼” thick cement board panels to EPS insulation. The EPS insulation can be provided as thin as 1-1/2” up to 6” in thickness with increments of increasing thickness of 1/8” (i.e. 1-1/2”, 1-5/8”, 1-3/4” etc…). Pre-selected and pre-specified screws for the different thicknesses of panels and the different possible substrates complete the ease of specifying and using the panels.
ProGUARDTM allows designers to meet the continuous insulation requirements of the more stringent energy codes introduced over the past few years, such as ASHRAE 90.1 and IECC, which require lower U-values (higher effective R-values) for wall construction.
ProGUARDTM panels also have drainage grooves cut into the front and back of the insulation to achieve drainage planes. These drainage planes allow for wind driven moisture behind the veneer to weep from the system and also allow moisture as the result of condensation (e.g. from vapor flow, air flow, dew points, etc.) to escape the wall system, effectively creating a thin-adhered masonry veneer rainscreen.
ProGUARDTM eliminates the need to install a drainage mat, insulation, and cement board in three separate steps. As a single product, ProGUARDTM collapses all these materials and their benefits into one – providing continuous insulation, drainage planes, and a stable and fully cured substrate to adhere thin-masonry veneers.
Arriscraft continues to lead the industry with high performance, naturally-made stone products and best practices in installation systems.
Project Details:
Project: Carbon County Courthouse & Administration Building
Location: Price, Utah
Architect: Scott P. Evans – Architect & Associates P.C. Contractor: Ascent Construction
Product: ARRIS.tile Café Smooth & Rocked Installed over ProGUARD Insulated Cement Board Panels with Laticrete MVIS materials.
Related Stories
75 Top Building Products | Nov 30, 2022
75 top building products for 2022
Each year, the Building Design+Construction editorial team evaluates the vast universe of new and updated products, materials, and systems for the U.S. building design and construction market. The best-of-the-best products make up our annual 75 Top Products report.
Energy-Efficient Design | Nov 14, 2022
How to achieve net zero energy in five steps
Martine Dion and Ethan Seaman share net zero energy best practices with owners and developers.
Building Materials | Nov 2, 2022
Design for Freedom: Ending slavery and child labor in the global building materials sector
Sharon Prince, Founder and CEO of Grace Farms and Design for Freedom, discusses DFF's report on slavery and enforced child labor in building products and materials.
Multifamily Housing | Sep 15, 2022
Toronto’s B-Line Condominiums completed using prefabricated panels
B-Line Condos, Toronto, completed using Sto Panel Technology.
Multifamily Housing | Sep 13, 2022
Take the Multifamily Kitchen + Bath survey – Maybe win one of 10 $50 gift cards
Preliminary results of 2022 Multifamily Design+Construction exclusive Kitchen + Bath survey.
Building Materials | Aug 3, 2022
Shawmut CEO Les Hiscoe on coping with a shaky supply chain in construction
BD+C's John Caulfield interviews Les Hiscoe, CEO of Shawmut Design and Construction, about how his firm keeps projects on schedule and budget in the face of shortages, delays, and price volatility.
Building Materials | Jun 20, 2022
Early-stage procurement: The next evolution of the construction supply chain
Austin Commercial’s Jason Earnhardt explains why supply chain issues for the construction industry are not going to go away and how developers and owners can get ahead of project roadblocks.
Sponsored | Insulation | May 9, 2022
Meet the Makers of Durable, Efficient Insulation and Sheathing
Discover the epitome durability and efficiency.
Contractors | Mar 28, 2022
Amid supply chain woes, building teams employ extreme procurement measures
Project teams are looking to eliminate much of the guesswork around product availability and price inflation by employing early bulk-purchasing measures for entire building projects.
Cladding and Facade Systems | Oct 26, 2021
14 projects recognized by DOE for high-performance building envelope design
The inaugural class of DOE’s Better Buildings Building Envelope Campaign includes a medical office building that uses hybrid vacuum-insulated glass and a net-zero concrete-and-timber community center.