flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arriscraft embraces new wall system to revolutionize its thin-clad stone installation

Sponsored Content Insulation

Arriscraft embraces new wall system to revolutionize its thin-clad stone installation

New Carbon County Courthouse & Administration Building (by Scott P. Evans Architect + Associates P.C.) features thin ARRIS.tile installed with ProGUARDTM insulated cement board panels


By Arriscraft | March 2, 2016

Scott P. Evans Architect & Associates P.C. designed the modern Carbon County Courthouse & Administration Building using ARRIS.tile Renaissance® Units.

Having little experience with the ARRIS.tile product, the architect for this project was educated on the Arriscraft line by Brickstone Inc. (which represents the stone company in Colorado, Utah, Wyoming and Idaho). Jason Evans, Construction & Marketing Manager at Scott P. Evans, says, ”After spending some time with the local product rep, we saw the value in incorporating ARRIS.tile into our job. The color options were great, working with a thin material was advantageous for our specific job, and the quality, durability and warranty sold us on the product. On the appropriate project we would definitely use ARRIS.tile again. We’ve already recommended it to other architects searching for this type of product.”

ProGUARDTM- An exciting, continuous insulation solution for thin adhered masonry industry

While naturally-made ARRIS.tile was used for the stunning cladding material, the wall system itself was revolutionary for the thin-adhered veneer market.  In addition to using the Laticrete Masonry Veneer Installation System (MVIS) to adhere the units and waterproof the assembly, the designers also chose to use the ProGUARDTM insulated cement board panels as well.  These panels are constructed by laminating ¼” thick cement board panels to EPS insulation.  The EPS insulation can be provided as thin as 1-1/2” up to 6” in thickness with increments of increasing thickness of 1/8” (i.e. 1-1/2”, 1-5/8”, 1-3/4” etc…).  Pre-selected and pre-specified screws for the different thicknesses of panels and the different possible substrates complete the ease of specifying and using the panels.

ProGUARDTM allows designers to meet the continuous insulation requirements of the more stringent energy codes introduced over the past few years, such as ASHRAE 90.1 and IECC, which require lower U-values (higher effective R-values) for wall construction.

ProGUARDTM panels also have drainage grooves cut into the front and back of the insulation to achieve drainage planes.  These drainage planes allow for wind driven moisture behind the veneer to weep from the system and also allow moisture as the result of condensation (e.g. from vapor flow, air flow, dew points, etc.) to escape the wall system, effectively creating a thin-adhered masonry veneer rainscreen.

ProGUARDTM eliminates the need to install a drainage mat, insulation, and cement board in three separate steps. As a single product, ProGUARDTM collapses all these materials and their benefits into one – providing continuous insulation, drainage planes, and a stable and fully cured substrate to adhere thin-masonry veneers.

Arriscraft continues to lead the industry with high performance, naturally-made stone products and best practices in installation systems.

 

Project Details:

Project: Carbon County Courthouse & Administration Building

Location: Price, Utah

Architect: Scott P. Evans – Architect & Associates P.C. Contractor: Ascent Construction

Product: ARRIS.tile Café Smooth & Rocked Installed over ProGUARD Insulated Cement Board Panels with Laticrete MVIS materials.

Tags

Related Stories

| Apr 16, 2013

5 projects that profited from insulated metal panels

From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.

| Jul 13, 2012

July 2012: Product Solutions

Insulation, ceiling panels, sunshades.

| Jun 28, 2012

Federal applications of renewable energy

U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

AIA 2030 Commitment Program reports new results

The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

Don’t be insulated from green building

Examining the roles of insulation and manufacturing in sustainability’s growth.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021