One of the biggest emblems of Atlanta's real estate boom became the biggest emblem of its bust recently.
Bank of America Plaza, the South’s tallest skyscraper and an Atlanta skyline icon, was taken back by its lender at a foreclosure auction at the Fulton County Courthouse. The 55-story tower, bought for a record price in 2006 by a California real estate firm, is now metro Atlanta’s priciest repossession.
A lawyer for LNR Partners placed two "credit bids" totaling $250 million. That means it essentially bid not with cash but rather the lender's own interest in the building. LNR represents the lender, a commercial mortgage-backed security owned by investors. The lender is likely to seek a new buyer, who will likely spruce up the tower and try to attract new tenants.
The building's distress stemmed from its last sale at the very height of the real estate boom. The prior owner, BentleyForbes bought the trophy tower for $436 million from Cousins Properties and Bank of America in 2006. Soon after, office vacancies soared and property values and rents plummeted following the economic collapse.
Timeline of a tower
Late 1980s -- C&S Bank and Cousins Properties announce plans for a new C&S headquarters, to be Atlanta’s tallest building, at 600 Peachtree Street.
1991 -- C&S/Sovran is acquired by Charlotte-based NCNB and becomes NationsBank, a precursor to Bank of America.
1992 – The 55-story, more than 1,000-foot building opens as NationsBank Plaza.
1999 – The tower’s name officially changes to Bank of America Plaza after NationsBank acquires Bank of America and takes its name.
2006 – California real estate firm BentleyForbes buys Bank of America Plaza from Bank of America and Cousins Properties for an Atlanta-record $436 million.
2011 – Fitch Ratings issues a report stating Bank of America Plaza is in “imminent default” and a special servicer has been brought in to help work out the troubled debt.
2012 – Bank of America Plaza is foreclosed.
An executive with BentleyForbes said in a statement the firm worked with LNR “for more than a year to identify a viable way forward,” and that transferring control to LNR and the bond holders was the best way forward.
The 1,023-ft tower is a garnet-hued obelisk when the sunset plays off its Napoleon red granite façade. Its 50-ton spire is splashed with 23-karat gold leaf.
The building was planned as the headquarters of C&S Bank in the late 1980s. It was later renamed for successors NationsBank and ultimately Bank of America.
The tower may not be the last signature office or retail complex to change owners. Delinquency rates for commercial mortgage backed securities, or CMBS, just one type of loan for commercial properties, remains near all-time highs in metro Atlanta, according to real estate research firm Trepp.
Bank of America Plaza By the Numbers
23 – The 50-ton spire at the top of Bank of America Plaza is covered in 23-karat gold leaf
55—Floors in the building
1,023 – Bank of America Plaza is 1,023 feet tall.
1.28 million – The total square footage of Bank of America Plaza
Architect: Kevin Roche, John Dinkeloo and Associates
A total of $2.54 billion in CMBS loans, or 20% of the value of all such loans, were past-due in metro Atlanta in January, according to Trepp. The delinquency figure nationwide was 9.52%.
Borrowers have struggled to refinance given falling values and trouble filling vacancies. Major banks and institutional investors also lent on commercial property, but CMBS loans, which typically make higher leveraged loans at high interest rates, became popular last decade. Their use peaked in 2007. Many CMBS loans come due in five years, making 2012 a feared year.
“I think unfortunately we’re only in about the third or fourth inning," said Henry Lorber, an expert in distressed real estate and a managing director at Atlanta-based Hays Financial Consulting.
Big-name tenants filled Bank of America Plaza when BentleyForbes bought it. But the owners soon had to grapple with the Great Recession, corporate cutbacks in office space and a glut of competing new space in Midtown and Buckhead. Ernst & Young left a few years ago and law firm Troutman Sanders and Bank of America reduced their space. Law firm Paul Hastings also is leaving for another building. In metro Atlanta, vacancy remained near record highs in the third quarter 2011 at 16.9%, according to CoStar Group, with rents at $18.36 per square foot, down from $20.28 in 2008.
Gil Burstiner, commercial real estate partner at the law firm of Hartman Simons, said the ordeal will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants. BD+C
Related Stories
K-12 Schools | Aug 29, 2024
Designing for dyslexia: How architecture can address neurodiversity in K-12 schools
Architects play a critical role in designing school environments that support students with learning differences, particularly dyslexia, by enhancing social and emotional competence and physical comfort. Effective design principles not only benefit students with dyslexia but also improve the learning experience for all students and faculty. This article explores how key design strategies at the campus, classroom, and individual levels can foster confidence, comfort, and resilience, thereby optimizing educational outcomes for students with dyslexia and other learning differences.
Museums | Aug 29, 2024
Bjarke Ingels' Suzhou Museum of Contemporary Art conceived as village of 12 pavilions
The 60,000-sm Suzhou Museum of Contemporary Art in Suzhou, Jiangsu, China recently topped out. Designed by Bjarke Ingels Group (BIG), the museum is conceived as a village of 12 pavilions, offering a modern interpretation of the elements that have defined the city’s urbanism, architecture, and landscape for centuries.
Adaptive Reuse | Aug 28, 2024
Cities in Washington State will offer tax breaks for office-to-residential conversions
A law passed earlier this year by the Washington State Legislature allows developers to defer sales and use taxes if they convert existing structures, including office buildings, into affordable housing.
Industrial Facilities | Aug 28, 2024
UK-based tire company plans to build the first carbon-neutral tire factory in the U.S.
ENSO, a U.K.-based company that makes tires for electric vehicles, has announced plans to build the first carbon-neutral tire factory in the U.S. The $500 million ENSO technology campus will be powered entirely by renewable energy. The first-of-its-kind tire factory aims to be carbon neutral without purchased offsets, using carbon-neutral raw materials and building materials.
Architects | Aug 28, 2024
KTGY acquires residential high-rise specialist GDA Architects
KTGY, an award-winning design firm focused on architecture, interior design, branded environments and urban design, announced that it has acquired GDA Architects, a Dallas-based architectural firm specializing in high rise residential, hospitality and industrial design.
K-12 Schools | Aug 26, 2024
Windows in K-12 classrooms provide opportunities, not distractions
On a knee-jerk level, a window seems like a built-in distraction, guaranteed to promote wandering minds in any classroom or workspace. Yet, a steady stream of studies has found the opposite to be true.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Airports | Aug 22, 2024
Portland opens $2 billion mass timber expansion and renovation to its international airport
This month, the Portland International Airport (PDX) main terminal expansion opened to passengers. Designed by ZGF for the Port of Portland, the 1 million-sf project doubles the capacity of PDX and enables the airport to welcome 35 million passengers per year by 2045.
Adaptive Reuse | Aug 22, 2024
6 key fire and life safety considerations for office-to-residential conversions
Office-to-residential conversions may be fraught with fire and life safety challenges, from egress requirements to fire protection system gaps. Here are six important considerations to consider.
Resiliency | Aug 22, 2024
Austin area evacuation center will double as events venue
A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.