flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BD+C's 29th Annual Reconstruction Awards

BD+C's 29th Annual Reconstruction Awards

Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation and addition projects.


October 4, 2012
This article first appeared in the October 2012 issue of BD+C.

PLATINUM

New York City Hall

 

 

Building 1500, Naval Air Station Pensacola

 

 

GOLD

Rice Fergus Miller Office & Studio

 

 

Wake Forest Biotech Place

 

 

SILVER

Allen Theatre at PlayhouseSquare

 

 

Residences at the John Marshall

 

 

220 Water Street

 

 

BRONZE

Walsh Group Training and Conference Center

 

 

Pomeroy Senior Apartments

 

 

DPR Construction, Phoenix Regional Office

 

 

SPECIAL RECOGNITION

Joplin Interim High School

 

 

THE JUDGES

 

 

 

 

 

 

Judges for Building Design+Construction’s 29th Annual Reconstruction Awards (left to right): George Karl Tuhowski III, Keith R. Hammelman, Martha Bell, Daniel E. Moser, and Walker C. Johnson.

Related Stories

| Aug 19, 2011

Enhanced acoustical design

Ambient noise levels in some facility types are trending up and becoming a barrier to clear communication between building occupants.

| Jul 22, 2011

The Right Platform for IPD

Workstations for successful integrated project delivery, a white paper by Dell and BD+C.

| Jul 22, 2011

High-performance windows and doors

Learning objectives After reading this article, you should be able to: Understand issues of thermal performance and energy efficiency in relation to window and door systems; describe optimal detailing of the window-wall interface and how it contributes to building performance, sustainability, and occupant well-being; understand how durability contributes to sustainable windows/doors; and list sustainable O&M requirements for window and door systems.

| Jul 21, 2011

Falling Architecture Billings Index reflects decrease in design demands

This months Architecture Billings Index (ABI), provided by the American Institute of Architects, is almost a full point lower than last month’s reported score. June’s reading of 47.2 was short of the required 50 to achieve billings increases, making July’s reading of 46.3 an unwelcome sign of market tidings.

| Jun 29, 2011

New leadership role for architects in net-zero design

BD+C Editorial Director Rob Cassidy talks with RNL Design's Tom Hootman, AIA, about the changing role of architects in net-zero designs.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021