flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

Mixed-Use

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.


By David Malone, Managing Editor | September 28, 2021
Farfetch HQ in Fuse Valley
All renderings Lucian R, courtesy of BIG

BIG has unveiled the design for a new headquarters building for Farfetch, a luxury online fashion platform. The purpose-built “fashion village” will be built on the slopes of Leça River in Porto, Portugal and is part of the larger Fuse Valley site. Fuse Valley, also designed by BIG, will feature 24 buildings that will be home to various tech companies, startups, and services.

“Rather than a corporate office complex, Farfetch’s future home in Fuse Valley will be a lively urban ensemble bringing every curator, creator, customer and collaborator together in the most innovative new neighborhood of the city,” said Bjarke Ingels, Founder and Creative Director, BIG, in a release. “The urban fabric will allow Fuse Valley to grow and expand organically, like a natural village.”

Farfetch HQ courtyard

The Farfetch project will feature 12 interconnected buildings that each represent the various elements of the company’s organization, with the design of each space tailored accordingly. BIG’s design will amplify the exchange of ideas between the different aspects of the organization and create new opportunities for the approximately 3,000 Farfetch employees based in Portugal, visitors, and locals.

SEE ALSO: New resort will be carved directly into a mountainside

Fuse Valley as a whole is organized around plazas, parks, and courtyards that are landscaped and programmed to connect the indoors with the outdoors. Individual buildings rest on a series of urban terraces connecting the main road to the east with the Leça River to the west. Along the central arrival axis, an urban alley will open all the way from the street to the river. It will feature all the major public programs and amenities along the riverfront of Farfetch, including lobbies, an academy, an auditorium, a canteen, and wellness facilities.

Farfetch and Fuse Valley outdoor gathering space

The project will be a manmade extension of the hillside. The roofs of the new buildings will rise and fall to create peaks and valleys with slopes and terraces providing employees with open spaces to enjoy breaks and host gatherings. Paths will extend from the landscape to the roofscape, creating flexible way finding for people to move around the complex.

Fust Valley building facades at ground level

Facades will recede at the ground flow to expand the public realm and create natural canopies to welcome visitors. The chamfered corners of the buildings will merge to create archways and openings between the courtyards that will act like canvases for different artistic expressions. Atelier-like attics with additional ceiling heights and open mezzanines will be created by the sloping roofs of the buildings. Open connections extend from the attic mezzanines all the way to the ground to create visual and physical connectivity across all floors.

Farfetch HQ interior collaboration space

The interior of all the buildings will prioritize an immersion in nature and provide a biophilic environment that will increase productivity and wellbeing. The vegetation will also provide a naturally shaded and cooled environment.

The Farfetch HQ project is slated to break ground in early 2023 and open in 2025.

Fuse Valley canteen

Fuse valley and Farfetch aerial view

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021