flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

Mixed-Use

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.


By David Malone, Managing Editor | September 28, 2021
Farfetch HQ in Fuse Valley
All renderings Lucian R, courtesy of BIG

BIG has unveiled the design for a new headquarters building for Farfetch, a luxury online fashion platform. The purpose-built “fashion village” will be built on the slopes of Leça River in Porto, Portugal and is part of the larger Fuse Valley site. Fuse Valley, also designed by BIG, will feature 24 buildings that will be home to various tech companies, startups, and services.

“Rather than a corporate office complex, Farfetch’s future home in Fuse Valley will be a lively urban ensemble bringing every curator, creator, customer and collaborator together in the most innovative new neighborhood of the city,” said Bjarke Ingels, Founder and Creative Director, BIG, in a release. “The urban fabric will allow Fuse Valley to grow and expand organically, like a natural village.”

Farfetch HQ courtyard

The Farfetch project will feature 12 interconnected buildings that each represent the various elements of the company’s organization, with the design of each space tailored accordingly. BIG’s design will amplify the exchange of ideas between the different aspects of the organization and create new opportunities for the approximately 3,000 Farfetch employees based in Portugal, visitors, and locals.

SEE ALSO: New resort will be carved directly into a mountainside

Fuse Valley as a whole is organized around plazas, parks, and courtyards that are landscaped and programmed to connect the indoors with the outdoors. Individual buildings rest on a series of urban terraces connecting the main road to the east with the Leça River to the west. Along the central arrival axis, an urban alley will open all the way from the street to the river. It will feature all the major public programs and amenities along the riverfront of Farfetch, including lobbies, an academy, an auditorium, a canteen, and wellness facilities.

Farfetch and Fuse Valley outdoor gathering space

The project will be a manmade extension of the hillside. The roofs of the new buildings will rise and fall to create peaks and valleys with slopes and terraces providing employees with open spaces to enjoy breaks and host gatherings. Paths will extend from the landscape to the roofscape, creating flexible way finding for people to move around the complex.

Fust Valley building facades at ground level

Facades will recede at the ground flow to expand the public realm and create natural canopies to welcome visitors. The chamfered corners of the buildings will merge to create archways and openings between the courtyards that will act like canvases for different artistic expressions. Atelier-like attics with additional ceiling heights and open mezzanines will be created by the sloping roofs of the buildings. Open connections extend from the attic mezzanines all the way to the ground to create visual and physical connectivity across all floors.

Farfetch HQ interior collaboration space

The interior of all the buildings will prioritize an immersion in nature and provide a biophilic environment that will increase productivity and wellbeing. The vegetation will also provide a naturally shaded and cooled environment.

The Farfetch HQ project is slated to break ground in early 2023 and open in 2025.

Fuse Valley canteen

Fuse valley and Farfetch aerial view

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021