CalStar, manufacturer of affordable, sustainable masonry products, has expanded the capacity of its Caledonia, Wis., manufacturing plant with the addition of a second shift. The expansion will help the company meet growing demand across all of its product lines.
“Increasing interest in our products combined with the improving construction economy had begun to stretch delivery lead times beyond acceptable limits,” said Michael Telischak, vice president of manufacturing for CalStar. “Adding a second shift has allowed us to accommodate that growth as well as further bolster our orders.”
The expansion created 17 new jobs at the plant, adding to the 38 existing staff in Caledonia and the 10 sales and marketing team members around the country. Along with new hires, the company’s internal training programs have helped several employees advance into positions of greater responsibility.
CalStar’s growth is felt across its brick, paver, and Thru-Wall lines. Among the largest drivers are a number of large facing-brick projects, such as a high school in Oxford, Miss.; springtime demand for pavers at more than 160 Home Depot locations; and skyrocketing orders for Thru-Wall units, including for several large retailers.
In addition, CalStar has added several new products to its offerings over the past six months, including wet cast products, 12x12 pavers, a monarch brick, and numerous colors and blends. The company also is able to create custom molds and color blends on special order for high-volume projects. One of its newest introductions, wet cast, has recently moved from pilot operation to production scale, and has been specified, along with CalStar brick, on high-profile projects including Courtyard by Marriott and Walgreens’ ground-breaking net-zero store in Evanston, Ill.
“We are thrilled with the growing rate of demand for our masonry products and even more pleased to be adding jobs to the Southwest Wisconsin region,” said CalStar CEO Joel Rood. “This plant expansion is further proof that architects and masons have recognized the sustainability, affordability, and aesthetic benefits of CalStar bricks, pavers, Thru-Wall units, and wet cast products.”
Like all of CalStar’s masonry offerings, the newest products are manufactured with up to 37% recycled content in a process that uses up to 81% less energy and emits up to 84% less CO2. Along with their sustainability properties, the products also cost up to 10% less than traditional options.
For more information, visit www.calstarproducts.com.
Related Stories
| Jan 4, 2012
New LEED Silver complex provides space for education and research
The academic-style facility supports education/training and research functions, and contains classrooms, auditoriums, laboratories, administrative offices and library facilities, as well as spaces for operating highly sophisticated training equipment.
| Jan 3, 2012
Gilbane awarded $88M Contract for Ohio elementary school construction
The new award, which comprises the construction of five new elementary schools and demolition of 11 older facilities, is the latest K-12 building program managed by Gilbane for the Ohio School Facilities Commission since 1998.
| Jan 3, 2012
AIA Course: New Developments in Concrete Construction
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 16, 2011
Stalco Construction converts Babylon, N.Y. Town Hall into history museum
The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.