CalStar, manufacturer of affordable, sustainable masonry products, has expanded the capacity of its Caledonia, Wis., manufacturing plant with the addition of a second shift. The expansion will help the company meet growing demand across all of its product lines.
“Increasing interest in our products combined with the improving construction economy had begun to stretch delivery lead times beyond acceptable limits,” said Michael Telischak, vice president of manufacturing for CalStar. “Adding a second shift has allowed us to accommodate that growth as well as further bolster our orders.”
The expansion created 17 new jobs at the plant, adding to the 38 existing staff in Caledonia and the 10 sales and marketing team members around the country. Along with new hires, the company’s internal training programs have helped several employees advance into positions of greater responsibility.
CalStar’s growth is felt across its brick, paver, and Thru-Wall lines. Among the largest drivers are a number of large facing-brick projects, such as a high school in Oxford, Miss.; springtime demand for pavers at more than 160 Home Depot locations; and skyrocketing orders for Thru-Wall units, including for several large retailers.
In addition, CalStar has added several new products to its offerings over the past six months, including wet cast products, 12x12 pavers, a monarch brick, and numerous colors and blends. The company also is able to create custom molds and color blends on special order for high-volume projects. One of its newest introductions, wet cast, has recently moved from pilot operation to production scale, and has been specified, along with CalStar brick, on high-profile projects including Courtyard by Marriott and Walgreens’ ground-breaking net-zero store in Evanston, Ill.
“We are thrilled with the growing rate of demand for our masonry products and even more pleased to be adding jobs to the Southwest Wisconsin region,” said CalStar CEO Joel Rood. “This plant expansion is further proof that architects and masons have recognized the sustainability, affordability, and aesthetic benefits of CalStar bricks, pavers, Thru-Wall units, and wet cast products.”
Like all of CalStar’s masonry offerings, the newest products are manufactured with up to 37% recycled content in a process that uses up to 81% less energy and emits up to 84% less CO2. Along with their sustainability properties, the products also cost up to 10% less than traditional options.
For more information, visit www.calstarproducts.com.
Related Stories
| Dec 6, 2011
New office building features largest solar panel system in New Orleans
Woodward Design+Build celebrates grand opening of new green headquarters in Central City.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 5, 2011
Gables Residential brings mixed-use building to Houston's Tanglewood area
The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 17, 2011
Hollister Construction Services renovating bank in Union City, N.J.
Project is part of a series of ground-up construction and renovation assignments.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.