flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chick-fil-A introduces modular building program for rebuilding and remodeling existing restaurants

Retail Centers

Chick-fil-A introduces modular building program for rebuilding and remodeling existing restaurants

The first location to use this rebuild style reopens on Oct. 15 near Atlanta.


By David Malone, Associate Editor | November 2, 2020
Chick-fil-A Roswell Town Center

Images courtesy Chick-fil-A

Chick-fil-A has introduced a modular building program that will reimagine the way the brand rebuilds and remodels its existing restaurants. By building portions of restaurants offsite and then shipping them to the construction site, Chick-fil-A will be able to reduce the construction schedule for their restaurant rebuilds and remodeling projects so operators and team members can return to work sooner.

Chick-fil-A Roswell Town Center, the first Chick-fil-A restaurant rebuilt as part of the modular building program, reopened for business on Thursday, Oct. 15. For this project, the Chick-fil-A Restaurant Design team partnered with Frey-Moss Structures to construct portions of the restaurant at its Conyers, Ga., facility. By constructing six separate modules completely offsite, comprising the restaurant's kitchen, drive-thru, serving area, office, and restrooms, the team was able to complete the construction approximately six weeks sooner than with traditional construction methods.

 

Modular Chick-fil-A construction

 

The new Chick-fil-A Roswell Town Center was rebuilt and redesigned to offer a more comfortable environment for both guests and team members. The restaurant now features a multi-lane drive-thru to expedite service, a more accommodating kitchen space, and canopies covering both the drive-thru and curbside pickup areas to protect guests and team members.

 

See Also: Mobile ordering is a centerpiece of Burger King’s new design

 

"By incorporating modularized construction into our restaurant development programs, we anticipate that we will be able to reduce the construction time needed to rebuild existing restaurants by 6-10 weeks,” said Gregg Lollis, Senior Director of Restaurant Design at Chick-fil-A. “Our team at Chick-fil-A has been researching this type of construction for several years, and we expect to introduce additional modular building projects in the coming months as we look to better support our restaurants.”

Related Stories

| Apr 24, 2013

Los Angeles may add cool roofs to its building code

Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is also asking the Department of Water and Power (LADWP) to create incentives that make it financially attractive for homeowners to install cool roofs.

| Apr 22, 2013

Top 10 green building projects for 2013 [slideshow]

The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.

| Apr 19, 2013

7 hip high-rise developments on the drawing board

Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul is among the compelling high-rise projects in the works across the globe.

| Apr 17, 2013

Frank Lloyd Wright's Park Avenue showroom demolished

New York loses another architectural gem by Frank Lloyd Wright as new owner razes auto showroom.

| Apr 5, 2013

Commercial greenhouse will top new Whole Foods store in Brooklyn

Whole Foods and partner Gotham Greens will create a 20,000-sf greenhouse atop one of the retailer's Brooklyn supermarkets. Expected to open this fall, the facility will supply produce to nine Whole Foods stores in metro New York City.

| Apr 2, 2013

6 lobby design tips

If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby, here are six principles from healthcare lobby design that make for happier users—and more satisfied owners.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021