flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction on Orlando’s massive ‘innovation hub’ is finally starting

Mixed-Use

Construction on Orlando’s massive ‘innovation hub’ is finally starting

The $1 billion Creative Village development will create a business and education hub.


By John Caulfield, Senior Editor | May 10, 2015
Construction on Orlando’s massive ‘innovation hub’ is finally starting

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. Rendering courtesy Creative Village Development 

The 68-acre, $1 billion Creative Village project in downtown Orlando, the largest transit-oriented project in central Florida, is expected to break ground on May 14.

This mixed-use project, which had been delayed for a number of years, is already being touted as mecca for business, colleges, and residents. The Orlando Business Journal reports that the University of Central Florida has committed to anchor the Village with a $207 million downtown campus that would create 4,000 jobs. UCF has stated its intention to bring 6,000 students downtown.

Creative Village is a public/private partnership between the City of Orlando and the Master Developer, Creative Village Development; a joint venture between Banc of America Community Development Corporation, and a local developer-investment team lead by Ustler Development. Baker Barrios Architects, the project’s design architect; and Emerge Real Estate Ventures, are part of that group.

The city’s Amway Arena was demolished in 2012 to make way for Creative Village. That demolition’s debris—including 94 million pounds of concrete and 13 million pounds of steel—was recycled and/or sorted for future reuse to build Creative Village’s infrastructure.

The development expected to take 15 to 20 years to complete, and include when finished 1.2 million sf of office and creative space, 500,000 sf of education space, 1,500 housing units, and 225 hotel rooms. A PS-8 school is planned nearby. Construction will create 6,500 jobs, and the Village would offer 5,000 permanent jobs. The Building Team estimates that Creative Village would also generate between $800 million and $1 billion in new development.

Road and utility work in Phase 1 would accommodate the expansion of the Lynz Lymmo bus circulator system to Orlando’s west side, near the Parramore District. Craig Ustler, MAI, CCIM, president of Ustler Development, said that about $13 million in infrastructure work on the bus route and the building paths is already taking shape.

Vertical construction is scheduled to begin in later 2015 or early 2016.

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021