flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Danish hospital is constructed from 24 steel frame modules

Modular Building

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.


By David Malone, Associate Editor | March 17, 2020
MARS Radiology equipment in modules

All photos courtesy FortaPRO

Forta PRO, a Latvian-based modular construction company, and MT Højgaard, a Danish construction company, recently completed the MARS Satellite Radiology Clinic building in Copenhagen, Denmark. The new clinic will provide additional acute care services to patients for faster and more advanced medical research.

The MARS clinic was built as a modular building off-site in Latvia and then shipped across the Baltic Sea to the assembly location. It combines 24 steel frame modules weighing up to 27 tons each. The most substantial blocks are equipped with all the necessary protection systems to provide safe and efficient operation for quicker patient diagnostics. The modules were designed to fit the most modern medical equipment such as X-Ray, CT, and MRI scanners.

 

FortaPRO module being lifted into place

 

Onsite construction was completed in only two weeks without disrupting neighboring working clinical departments or blocking traffic pathways for ambulances. By assembling the modules in a factory, onsite dust and noise was mitigated as compared to traditional construction.

 

See Also: China builds 645,000-sf coronavirus hospital in 10 days

 

 

MARS Radiology clinic exterior

Related Stories

Projects | Mar 15, 2022

Old Sears store will become one of the largest orthopaedics outpatient facilities in the Northeast

A former Sears store in Rochester, N.Y., will be transformed into one of the largest orthopaedics outpatient facilities in the Northeast.

Projects | Mar 10, 2022

Optometrist office takes new approach to ‘doc-in-a-box’ design

In recent decades, franchises have taken over the optometry services and optical sales market. This trend has spawned a commodity-type approach to design of office and retail sales space.

Industry Research | Mar 2, 2022

31 percent of telehealth visits result in a physical office visit

With little choice but to adopt virtual care options due to pandemic restrictions and interactions, telehealth adoption soared as patients sought convenience and more efficient care options.

Resiliency | Feb 15, 2022

Design strategies for resilient buildings

LEO A DALY's National Director of Engineering Kim Cowman takes a building-level look at resilient design. 

Healthcare Facilities | Feb 10, 2022

Respite for the weary healthcare worker

The pandemic has shined a light on the severe occupational stress facing healthcare workers. Creating restorative hospital environments can ease their feelings of anxiety and burnout while improving their ability to care for patients.

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

Healthcare Facilities | Jan 7, 2022

Supporting hope and healing

Five research-driven design strategies for pediatric behavioral health environments.

Healthcare Facilities | Dec 20, 2021

Stantec will design the new Queensway Health Centre

The project is located in Toronto.

Healthcare Facilities | Dec 16, 2021

Leo A Daly designs mental health clinic for veterans in Tampa

The new facility will consolidate all mental health services the VA offers into one clinic.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021