flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Danish hospital is constructed from 24 steel frame modules

Modular Building

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.


By David Malone, Associate Editor | March 17, 2020
MARS Radiology equipment in modules

All photos courtesy FortaPRO

Forta PRO, a Latvian-based modular construction company, and MT Højgaard, a Danish construction company, recently completed the MARS Satellite Radiology Clinic building in Copenhagen, Denmark. The new clinic will provide additional acute care services to patients for faster and more advanced medical research.

The MARS clinic was built as a modular building off-site in Latvia and then shipped across the Baltic Sea to the assembly location. It combines 24 steel frame modules weighing up to 27 tons each. The most substantial blocks are equipped with all the necessary protection systems to provide safe and efficient operation for quicker patient diagnostics. The modules were designed to fit the most modern medical equipment such as X-Ray, CT, and MRI scanners.

 

FortaPRO module being lifted into place

 

Onsite construction was completed in only two weeks without disrupting neighboring working clinical departments or blocking traffic pathways for ambulances. By assembling the modules in a factory, onsite dust and noise was mitigated as compared to traditional construction.

 

See Also: China builds 645,000-sf coronavirus hospital in 10 days

 

 

MARS Radiology clinic exterior

Related Stories

| Feb 14, 2013

Boxman Studios launches shipping container buildings division

Boxman Studios has launched a new division aimed at sustainable solutions for the Built Environment. The Boxman Studios Buildings Division will focus on the adaptive use of decommissioned shipping containers as architectural elements and even complete buildings.

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 19, 2012

Modular, LEED-Gold Certified Dormitory Accommodates Appalachian State University Growth

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with traditional construction.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021