flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

As demand rises for EV chargers at multifamily housing properties, options and incentives multiply

MFPRO+ News

As demand rises for EV chargers at multifamily housing properties, options and incentives multiply

Owners must choose types of chargers and examine state rebates, federal tax breaks


By Peter Fabris, Contributing Editor | January 12, 2024
As demand rises for EV chargers at multifamily housing properties, options and incentives multiply - Image by A. Krebs from Pixabay
Image by A. Krebs from Pixabay

As electric vehicle sales continue to increase, more renters are looking for apartments that offer charging options.

EV sales increased by 67% from 2021 to 2022, and are projected to account for nearly 30% of vehicle sales by 2030. Renters who own or are considering buying an EV are willing to pay higher rents for charging capability. A 2022 National Multifamily Housing Council survey found that 27% of renters would pay $28.12 more per month for access to chargers.

Multifamily owners also face regulatory pressure to install chargers. The U.S. Dept. of Energy adopted an International Code Council provision requiring apartment communities to provide EV charging infrastructure for up to 20% of lots with 25 or more parking spaces.

Multifamily properties can install two types of chargers: Level 1 are the most affordable costing $300 to $1,500 each, but can only provide about 5 miles of range per hour. Level 2 models, the most common in apartment buildings, cost up to $7,500 and offer 16 to 25 miles of range per hour.

Some states have government and utility rebates and incentives, and the federal Inflation Reduction Act reinstated a tax credit of up to 30% of the cost. Applying for these incentives, though, is a complex process.

Related Stories

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Multifamily Housing | Aug 21, 2024

Nation's leading multifamily developer expands into infrastructure

Greystar's strategy for infrastructure is driven by the shifting landscape of today's cities—primarily in the increased digitization, urbanization, and transitions to clean energy.

MFPRO+ New Projects | Aug 20, 2024

Seattle workforce housing project inspired by geology of eastern Washington

J.G. Whittier Apartments, a workforce housing project in Seattle uses the geology of eastern Washington as inspiration for the design. The architecture and interior design celebrate geometric anomalies found in nature. At the corners of the building, blackened wood siding “erodes” to expose vibrant murals underneath.

MFPRO+ New Projects | Aug 16, 2024

At 60 stories, the Paramount multifamily development will stand as Nashville’s tallest high rise

When complete, the 60-story Paramount building, at 750 feet high, will be the tallest high rise tower in Nashville, Tenn., surpassing the city’s current record holder, the 617-foot AT&T Building. The $390 million Paramount project recently launched condo sales after securing more than $230 million in construction financing.

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

MFPRO+ News | Aug 14, 2024

Report outlines how Atlanta can collaborate with private sector to spur more housing construction

A report by an Urban Land Institute’s Advisory Services panel, commissioned by the city’s housing authority, Atlanta Housing (AH), offered ways the city could collaborate with developers to spur more housing construction.

Modular Building | Aug 13, 2024

Strategies for attainable housing design with modular construction

Urban, market-rate housing that lower-income workers can actually afford is one of our country’s biggest needs. For multifamily designers, this challenge presents several opportunities for creating housing that workers can afford on their salaries.

MFPRO+ Research | Aug 9, 2024

Apartment completions to surpass 500,000 for first time ever

While the U.S. continues to maintain a steady pace of delivering new apartments, this year will be one for the record books.

Affordable Housing | Aug 7, 2024

The future of affordable housing may be modular, AI-driven, and made of mushrooms

Demolished in 1989, The Phoenix Ironworks Steel Factory left a five-acre hole in West Oakland, Calif. After sitting vacant for nearly three decades, the site will soon become utilized again in the form of 316 affordable housing units.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021