flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design details released about new development in Seattle’s vibrant Belltown district

Mixed-Use

Design details released about new development in Seattle’s vibrant Belltown district

Connecting the building, called Archetype, to the street, neighborhood, and bay is a key imperative.


By John Caulfield, Senior Editor | June 30, 2021
First floor elevation of 11-story Archetype, a mixed-use building under development in Seattle
First floor elevation of 11-story Archetype, a mixed-use building under development in Seattle

Sometime in mid to late 2022, construction is scheduled to start on Archetype, an 11-story mixed-use development that, upon completion in 2024, will be wedged between the historic Hull and Glaser buildings on 1st Avenue in Seattle’s Belltown, that city’s most densely populated neighborhood, which has transformed from what was once a low-rent warehouse district to a walkable community with galleries, restaurants, shops, residential towers and lofts, schools and colleges that include the Art Institute of Seattle.

Seattle-based HEWITT is the Executive Architect on the Archetype project for the developer Burrard Properties, which also brought on board Basel, Switzerland-based Herzog & de Meuron as Design Consultant. The latter firm’s expertise includes respecting legacy buildings and their historical context while transforming spaces into something new. This is Herzog & De Meuron’s first project in Seattle.

“Herzog & de Meuron’s expertise in creating iconic buildings, coupled with our intimate knowledge and lived experience in Seattle, creates a team strategically positioned to champion good design in the heart of our city,” says Julia Nagele, Principal and Director of Design at HEWITT.

Today, the developer released design details about Archetype, as well as renderings.

 

AN ACTIVE STREETFRONT, AND BAY VIEWS

The building, on a 13,230-sf square lot, is located at a pivotal juncture where the northern entrance to the new Seattle waterfront intersects with Belltown.

A laneway with cafe is one of Archetype's amenities

An active streetfront is the entry point to a semi-private laneway that connects Archetype to its alley and 1st Avenue.

Laneway that goes partly into Archetype building

 

Two curved showcases, or vitrines, will provide a continuous active street front and mark the entry point of a semi-private laneway heading to the building’s rear alley. (Alleys have cultural and historic significance in Seattle, and this project presents an opportunity to connect the alley with 1st Avenue.) This is where Archetype opens toward Elliott Bay via its crescent shape that creates a courtyard surrounded by residential units with views of the bay and beyond.

Fostering a relationship with the street and neighborhood was an important project priority for the design team. Street level retail, food and beverage outlets are fronted by a low barrier, high transparency façade that alludes to classical architectural forms and maximizes natural light and air through an expansive window system. Metal and mineral cladding are meant to recall Belltown’s warehouse and semi-industrial roots.

 

First-floor commercial space at Archetype.

The designers proposed 7,500 sf of commercial space as part of Archetype.

 

The developer did not release information about this project’s cost. BD&C confirmed that there will be “up to” 180 apartments in the building, and that Swinerton is serving in a construction management capacity. An “early design guidance” document that the designers submitted to Seattle’s Downtown Design Review Board last September proposed that Archetype would be 95 ft tall, have between one and three stories of below-grade parking with 30-50 parking stalls and 165 bicycle parking spaces, a rooftop amenity of between 5,000 and 10,000 sf, and about 7,500 sf of street-level commercial.

Tags

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021