flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At the end of Q3 2021, Dallas tops the U.S. hotel construction pipeline

Hotel Facilities

At the end of Q3 2021, Dallas tops the U.S. hotel construction pipeline

The top 25 U.S. markets account for 33% of all pipeline projects and 37% of all rooms in the U.S. hotel construction pipeline.


By Lodging Econometrics | October 28, 2021
Dallas, Texas

Courtesy Pixabay

In the third quarter of 2021, analysts at Lodging Econometrics (LE) report that the top five markets with the largest total hotel construction pipelines by projects are: Dallas with 147 projects/17,711 rooms, Atlanta with 139 projects/18,659 rooms, Los Angeles with 133 projects/22,145 rooms, New York City with 130 projects/22,417 rooms, and Houston, with 90 projects/9,225 rooms. These top five markets account for 13% of the projects and 15% of rooms in the total U.S. pipeline.

The top 25 U.S. markets account for 33% of all pipeline projects and 37% of all rooms in the U.S. hotel construction pipeline. There are currently nine markets in the United States that have 20 or more projects under construction in their pipelines. Markets with the greatest number of projects already in the ground are New York with 95 projects/16,516 rooms, Atlanta with 33 projects/5,311 rooms, Dallas with 31 projects/4,399 rooms, Los Angeles with 30 projects/4,954 rooms, and Austin with 28 projects/3,577 rooms. Atlanta has the greatest number of projects scheduled to start construction in the next 12 months, with 54 projects/7,529 rooms. Dallas follows with 48 projects/5,643 rooms, and then Los Angeles with 47 projects/7,343 rooms, Phoenix with 44 projects/4,834 rooms, and Houston with 42 projects/3,748 rooms. The top five markets with the greatest number of projects in the early planning stage at the end of the third quarter are Dallas with 68 projects/7,669 rooms, Los Angeles with 56 projects/9,848 rooms, Atlanta with 52 projects/5,819, Orlando with 41 projects/7,754 rooms, and Washington D.C. with 40 projects/7,310 rooms.

The increased demand for building materials and shortages in supply, in the wake of the COVID-19 pandemic, has led to higher prices and continues to be major hurdles for contractors, developers, and investors. Nevertheless, in the third quarter, Dallas has the highest number of new projects announced into the pipeline with 18 projects/1,756 rooms. Atlanta follows with 17 projects/1,777 rooms, Phoenix with 10 projects/1,819 rooms, and then Houston with 9 projects/946 rooms.

The renovation and conversion pipeline shows no sign of decline. Presently, there are 1,253 hotels/176,305 rooms under renovation or conversion across the U.S., and twenty-four of the top 50 markets in the U.S. currently have 10 or more hotels undergoing renovation or conversion activity at the end of Q3‘21.

In the first three quarters of 2021, the U.S. opened 665 new hotels with 85,306 rooms. The markets with the highest number of new openings throughout the first three quarters are New York City with 21 hotels/3,554 rooms, Atlanta with 21 hotels/2,925 rooms, Orlando with 19 hotels/2,908 rooms, Houston with 16 hotels/2,166 rooms and Nashville with 16 hotels/2,116 rooms. In Q3, alone, the top 50 markets in the U.S. saw 98 hotels /15,454 rooms open. The U.S. had 189 hotels/25,995 rooms total open in the third quarter.

In 2021, New York City is forecasted to open 51 new hotels and 7,074 rooms, Atlanta follows with 25 hotels/3,499 rooms, then Nashville with 23 hotels/3,011 rooms, Houston with 23 hotels/2,787 rooms, and Orlando with 21 hotels/3,393 rooms. U.S. supply growth is forecasted to be 2.0% in 2021 and is expected to remain the same into 2022.

Related Stories

Engineers | Jun 14, 2023

The high cost of low maintenance

Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.

Mixed-Use | Jun 12, 2023

Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex

Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf). 

Architects | Jun 6, 2023

Taking storytelling to a new level in building design, with Gensler's Bob Weis and Andy Cohen

Bob Weis, formerly the head of Disney Imagineering, was recently hired by Gensler as its Global Immersive Experience Design Leader. He joins the firm's co-CEO Andy Cohen to discuss how Gensler will focus on storytelling to connect people to its projects.

Mass Timber | May 23, 2023

Luxury farm resort uses CLT framing and geothermal system to boost sustainability

Construction was recently completed on a 325-acre luxury farm resort in Franklin, Tenn., that is dedicated to agricultural innovation and sustainable, productive land use. With sustainability a key goal, The Inn and Spa at Southall was built with cross-laminated and heavy timber, and a geothermal variant refrigerant flow (VRF) heating and cooling system.

Hotel Facilities | May 9, 2023

A new camping destination near Utah’s Zion National Park offers a variety of all-season lodgings and amenities

Outdoor lodging brand AutoCamp has opened a new camping destination near Utah’s Zion National Park. A 16-acre property, AutoCamp Zion is located between the Virgin River and the desert of Southern Utah.

Digital Twin | May 8, 2023

What AEC professionals should know about digital twins

A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.

Hotel Facilities | May 2, 2023

U.S. hotel construction up 9% in the first quarter of 2023, led by Marriott and Hilton

In the latest United States Construction Pipeline Trend Report from Lodging Econometrics (LE), analysts report that construction pipeline projects in the U.S. continue to increase, standing at 5,545 projects/658,207 rooms at the close of Q1 2023. Up 9% by both projects and rooms year-over-year (YOY); project totals at Q1 ‘23 are just 338 projects, or 5.7%, behind the all-time high of 5,883 projects recorded in Q2 2008.

Market Data | Apr 11, 2023

Construction crane count reaches all-time high in Q1 2023

Toronto, Seattle, Los Angeles, and Denver top the list of U.S/Canadian cities with the greatest number of fixed cranes on construction sites, according to Rider Levett Bucknall's RLB Crane Index for North America for Q1 2023.

Contractors | Apr 10, 2023

What makes prefabrication work? Factors every construction project should consider

There are many factors requiring careful consideration when determining whether a project is a good fit for prefabrication. JE Dunn’s Brian Burkett breaks down the most important considerations. 

Building Tech | Mar 14, 2023

Reaping the benefits of offsite construction, with ICC's Ryan Colker    

Ryan Colker, VP of Innovation at the International Code Council, discusses how municipal regulations and inspections are keeping up with the expansion of off-site manufacturing for commercial construction. Colker speaks with BD+C's John Caulfield.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021