flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

Mixed-Use

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

The Charlottesville, Va. project is slated for completion later this year.


By David Malone, Associate Editor | April 20, 2021
CODE exterior aerial in Charlottesville

All renderings courtesy EskewDumezRipple

The Center for Developing Entrepreneurs (CODE), located in Charlottesville, Va., will provide 215,000-sf of multi-use space for entrepreneurs, designers, and developers, as well as ground floor retail. The project will act as a connective ligature between the institutional, commercial, and the historic avenues of the city.

CODE will feature an open-air, pedestrian gallery that will promote public circulation from the Mall to Water Street. At the center of the site there will be an exterior courtyard with a sunken water feature and amphitheater for public and private outdoor events. A series of planted rooftop terraces will be visible as the building steps up from the Mall to Water Street. These outdoor terraces will serve as work and gathering spaces for tenants on each floor.

 

CODE coworking commons

 

A variety of retail spaces will be included on the ground floor along with the main lobby entry on the Downtown Mall. A secondary entrance to the lobby will be provided on Water Street. The Water Street side lobby space will be able to double as a coworking studio when not being used as a 200-plus seat auditorium that serves both tenant specific and local community events.

One level of subgrade parking is included and will feature electric vehicle charging stations. Parking spaces have the ability to be converted to alternate uses in anticipation of evolving transportation trends.

 

CODE exterior during the day

 

The design employs systems and technologies that will increase the fresh air exchange and provide fine-tuned environmental controls allowing for natural ventilation and daylighting. Additionally, the building will harvest and reuse rainwater for green roof irrigation.

CODE is targeting LEED Gold certification and is slated for completion later this year.

 

CODE center courtyard space

 

The build team includes:

Design Architect: EskewDumezRipple

Architect of Record: Wolf Ackerman

Contractor: Hourigan Group

Civil Engineer: Timmons Group, Inc. 

Structural Engineer: Fox and Associates, Inc. 

Mechanical Engineer: 2RW Consulting Engineers

Electrical Engineer: 2RW Consulting Engineers

Landscape: Gregg Bleam Landscape Architect

 

CODE library space

 

CODE reception area

Tags

Related Stories

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

Mixed-Use | Jul 21, 2020

Phase one of The Orbit masterplan detailed for Innisfil, Ontario

Partisans is designing the project.

Mixed-Use | Jul 20, 2020

J. Small Investments, Lyda Hill Philanthropies have unveiled plans for a 23-acre mixed-use development in Dallas

The vacant campus was purchased from ExxonMobil Oil Corporation in 2015.

Mixed-Use | Jul 17, 2020

Ryan Companies breaks ground on 122-acre Highland Bridge redevelopment in St. Paul, Minn.

The community’s goal is to provide 100% renewable energy to its houses and businesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021