The Center for Developing Entrepreneurs (CODE), located in Charlottesville, Va., will provide 215,000-sf of multi-use space for entrepreneurs, designers, and developers, as well as ground floor retail. The project will act as a connective ligature between the institutional, commercial, and the historic avenues of the city.
CODE will feature an open-air, pedestrian gallery that will promote public circulation from the Mall to Water Street. At the center of the site there will be an exterior courtyard with a sunken water feature and amphitheater for public and private outdoor events. A series of planted rooftop terraces will be visible as the building steps up from the Mall to Water Street. These outdoor terraces will serve as work and gathering spaces for tenants on each floor.
A variety of retail spaces will be included on the ground floor along with the main lobby entry on the Downtown Mall. A secondary entrance to the lobby will be provided on Water Street. The Water Street side lobby space will be able to double as a coworking studio when not being used as a 200-plus seat auditorium that serves both tenant specific and local community events.
One level of subgrade parking is included and will feature electric vehicle charging stations. Parking spaces have the ability to be converted to alternate uses in anticipation of evolving transportation trends.
The design employs systems and technologies that will increase the fresh air exchange and provide fine-tuned environmental controls allowing for natural ventilation and daylighting. Additionally, the building will harvest and reuse rainwater for green roof irrigation.
CODE is targeting LEED Gold certification and is slated for completion later this year.
The build team includes:
Design Architect: EskewDumezRipple
Architect of Record: Wolf Ackerman
Contractor: Hourigan Group
Civil Engineer: Timmons Group, Inc.
Structural Engineer: Fox and Associates, Inc.
Mechanical Engineer: 2RW Consulting Engineers
Electrical Engineer: 2RW Consulting Engineers
Landscape: Gregg Bleam Landscape Architect
Related Stories
Mixed-Use | Oct 7, 2024
New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment
Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.
Affordable Housing | Oct 4, 2024
3 new affordable housing projects for October 2024
As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.
Mixed-Use | Sep 19, 2024
A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood
Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.
Mixed-Use | Sep 10, 2024
Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower
Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.
Codes and Standards | Sep 3, 2024
Atlanta aims to crack down on blighted properties with new tax
A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Mixed-Use | Aug 21, 2024
Adaptive reuse of a Sears store becomes luxury mixed-use housing
6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.
Curtain Wall | Aug 15, 2024
7 steps to investigating curtain wall leaks
It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus.
Adaptive Reuse | Aug 14, 2024
Adaptive reuse revives a former warehouse in St. Louis
The Victor, as the building is now called, has nearly 400 residential apartments.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.