flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fiber cement panels bridge historic and modern at Minneapolis apartment complex

Sponsored Content

Fiber cement panels bridge historic and modern at Minneapolis apartment complex

The design team for the Third North apartment complex specified Nichiha’s Illumination Series architectural panels in a blend of six colors—divided into swaths of reds and swaths of grays—that combine with a rectilinear shape to complement nearby brick.


By Nichiha | June 4, 2014
The panels have rectangular dimensions, with shades of red and gray to mirror th
The panels have rectangular dimensions, with shades of red and gray to mirror the colors of the brick and concrete on nearby his

Minneapolis’ North Loop neighborhood, like many close-in urban environments, is a community in transition. Over the past decade, property owners and developers have gradually blended and adapted historic buildings and warehouses with new residential blocks and modern amenities.

Respecting those existing aesthetics while addressing the wishes and needs of a younger generation were key goals for the developers of Third North, a 204-unit apartment complex completed in December 2013. The resulting six-story building manages to pay homage to existing structures without feeling dated.

A warehouse-like massing and the structure’s position abutting the sidewalk on three sides reflect the frontage of nearby warehouses, many of which have been adapted into office space or condos. The building’s U shape conceals residential features, including green space, a dog run, and pool—in the center and rear.


CHALLENGE
Create a modern-feeling façade without contrasting too much with the surrounding neighborhood.

SOLUTION
Nichiha’s Illumination series in a blend of six colors offers a shape and pattern reminiscent of nearby historic brick buildings and warehouses.

RESULT
Third North complements the varying elevations and façades of the neighborhood while bringing a fresh look to the streetscape.

Cladding selection also played a key role. The designers specified Nichiha’s 18”-by-6’ Illumination Series architectural wall panels in a blend of six colors—divided into swaths of reds and swaths of grays—that combine with a rectilinear shape to complementnearby brick. Simultaneously, the panels’ large, smooth scale and nod to metal help the overall look tilt toward the contemporary. 

“The panels have rectangular dimensions, and we have shades of red and gray,” says Maureen Michalski, senior project manager for Schafer Richardson, developer of Third North. “It mirrors the colors of the brick and concrete on nearby historic buildings, but is a fresh, modern take off of it. The use of stacked bond also helps in this regard.”

Moving forward with the material wasn’t completely straightforward, however, prior to the Third North project, the city of Minneapolis didn’t allow fiber cement to cover more than 30% of a building’s façade. The architects submitted for an exception, and Illumination Series’ commercial look, aided by its hidden fastening system and the performance brought by an integrated rainscreen that creates an airspace to allow water to drain away, helped it receive an allowance. In the end, the city and the community were equally pleased with the finished product, potentially paving the way for similar applications in the future.

Along with its eye-catching aesthetics, the market-rate apartments offer a host of interior and exterior features attractive to the young renters flocking to the walkable, transit-oriented North Loop. In keeping with the active mindset that proliferates Minneapolis, the complex includes extensive fitness facilities along with the pool and outdoor green space, as well as a bicycle maintenance room for two-wheeled commuters. 

In addition to the outdoor off-leash area, a dog grooming room caters to resident pet owners. A rentable guest suite, a club room, and outdoor seating round out the extensive list of communal comforts.

The units themselves boast open floor plans and feature stainless steel Energy Star appliances and efficient lighting, with several finish level options from which to choose.

With its lengthy list of amenities, an ideal location, and eye-catching aesthetics, Third North has been a welcome addition to the neighborhood—one that’s likely to fill up fast. 

For more information about Illumination Series and other Nichiha products, please visit: www.nichiha.com.

Related Stories

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

| Oct 3, 2011

Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Jul 22, 2011

Air barrier systems: Your guide to optimal performance

Expert advice on how to control wasteful air leakage in the building envelope.

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

| Oct 13, 2010

Community college plans new campus building

Construction is moving along on Hudson County Community College’s North Hudson Campus Center in Union City, N.J. The seven-story, 92,000-sf building will be the first higher education facility in the city.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021