The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. You’ll want to be sure your firm is on the Giants 300 list, as potential clients look to these rankings for prospective firms to design and construct their future projects.
Giants 300 results will be published in our July 2014 issue.
CLICK HERE TO DOWNLOAD THE 2014 GIANTS 300 SURVEY
NOTE: The Excel document has multiple tabs. If you do not see the tabs at the bottom of the worksheet, go to the “view” tab on the menu and select “full screen." You should see six tabs at the bottom.
Completed surveys must be returned by Wednesday, May 21, 2014.
Please fill out the survey form and attach it in an email to BOTH dbarista@sgcmail.com and bdcGiants2014@sgcmail.com.
There are two additional ways to participate in the July Giants 300 report:
1. SUBMIT YOUR LATEST PROJECT PHOTOS FOR CONSIDERATION
As in years past, we're looking for great project photos for use in the July Giants issue, including on the cover. Please email your photo submissions to me (dbarista@sgcmail.com) by May 21. If possible, please include a short description of each image, with the project name and location and key Building Team members (owner/client, architect, structural engineer, MEP engineer, and contractor)
2. SUBMIT YOUR IDEAS FOR THE JULY GIANTS ISSUE EDITORIAL COVERAGE
The editors would like to hear from your AEC teams on the latest trends, projects, and innovations across a number of major building sectors that will be covered in the July Giants issue. They include: healthcare, K-12 schools, higher education, data centers, multifamily, government, reconstruction, office, hospitality/hotels, green, BIM/VDC, military, and science and technology. Please email a short summary (and photos, if applicable) of your trends/innovations/projects for any of these sectors to dbarista@sgcmail.com by May 7.
Questions? Contact David Barista, Editor-in-Chief, at dbarista@sgcmail.com or 847-954-7929.
Related Stories
Airports | Feb 10, 2019
Chicago searches for the right design to expand O’Hare Airport and make passenger connections less stressful
Competition finalists took different approaches to rethinking the logistics of a gigantic, hectic space.
Airports | Oct 31, 2018
Foster + Partners’ Mexico City Airport has been cancelled
The project was set to cost $13.3 billion.
Airports | Aug 3, 2018
Airport trends 2018: Full flights with no end in sight
As service demand surges, airports turn to technology, faster building techniques.
Airports | May 31, 2018
Denver's airport city
Cultivation of airport cities is an emerging development strategy shaped by urban planners, civic leaders, airport executives, and academics.
| May 24, 2018
Accelerate Live! talk: Security and the built environment: Insights from an embassy designer
In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.
Retail Centers | Apr 19, 2018
Miami International Airport is home to the first Johnnie Walker store in the U.S.
The store will be a permanent fixture in the airport’s North Terminal.
Airports | Feb 21, 2018
Terminal Modernization: Why Bother? Part II
This is the second post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.
Airports | Feb 7, 2018
LaGuardia Airport receives eight private work booths in Terminal B
The hub sees over 15 million travelers annually.
Libraries | Jan 29, 2018
Commercial plane that skidded off the runway may become Turkey’s newest public library
The plane was removed from its cliffside perch five days after the incident.
Giants 400 | Oct 5, 2017
On wings of gold: Alternative financing schemes are propelling the high-flyin’ air terminals sector
The $4 billion renovation of New York City’s LaGuardia Airport is the first major U.S. aviation project delivered using a public-private partnership (P3) model.