flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Final call for entries: 2014 Giants 300 survey

Final call for entries: 2014 Giants 300 survey

The Giants 300 survey results will be published in the July 2014 issue of Building Design+Construction.


By BD+C Staff | May 11, 2014

The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. You’ll want to be sure your firm is on the Giants 300 list, as potential clients look to these rankings for prospective firms to design and construct their future projects.

Giants 300 results will be published in our July 2014 issue.

 

CLICK HERE TO DOWNLOAD THE 2014 GIANTS 300 SURVEY

 

NOTE: The Excel document has multiple tabs. If you do not see the tabs at the bottom of the worksheet, go to the “view” tab on the menu and select “full screen." You should see six tabs at the bottom.

Completed surveys must be returned by Wednesday, May 21, 2014.

Please fill out the survey form and attach it in an email to BOTH dbarista@sgcmail.com and bdcGiants2014@sgcmail.com.


There are two additional ways to participate in the July Giants 300 report:  

1. SUBMIT YOUR LATEST PROJECT PHOTOS FOR CONSIDERATION
As in years past, we're looking for great project photos for use in the July Giants issue, including on the cover. Please email your photo submissions to me (dbarista@sgcmail.com) by May 21. If possible, please include a short description of each image, with the project name and location and key Building Team members (owner/client, architect, structural engineer, MEP engineer, and contractor) 

2. SUBMIT YOUR IDEAS FOR THE JULY GIANTS ISSUE EDITORIAL COVERAGE
The editors would like to hear from your AEC teams on the latest trends, projects, and innovations across a number of major building sectors that will be covered in the July Giants issue. They include: healthcare, K-12 schools, higher education, data centers, multifamily, government, reconstruction, office, hospitality/hotels, green, BIM/VDC, military, and science and technology. Please email a short summary (and photos, if applicable) of your trends/innovations/projects for any of these sectors to dbarista@sgcmail.com by May 7.   

Questions? Contact David Barista, Editor-in-Chief, at dbarista@sgcmail.com or 847-954-7929.

Related Stories

Airports | Feb 10, 2019

Chicago searches for the right design to expand O’Hare Airport and make passenger connections less stressful

Competition finalists took different approaches to rethinking the logistics of a gigantic, hectic space.

Airports | Oct 31, 2018

Foster + Partners’ Mexico City Airport has been cancelled

The project was set to cost $13.3 billion.

Airports | Aug 3, 2018

Airport trends 2018: Full flights with no end in sight

As service demand surges, airports turn to technology, faster building techniques.

Airports | May 31, 2018

Denver's airport city

Cultivation of airport cities is an emerging development strategy shaped by urban planners, civic leaders, airport executives, and academics.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Retail Centers | Apr 19, 2018

Miami International Airport is home to the first Johnnie Walker store in the U.S.

The store will be a permanent fixture in the airport’s North Terminal.

Airports | Feb 21, 2018

Terminal Modernization: Why Bother? Part II

This is the second post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.

Airports | Feb 7, 2018

LaGuardia Airport receives eight private work booths in Terminal B

 The hub sees over 15 million travelers annually.

Libraries | Jan 29, 2018

Commercial plane that skidded off the runway may become Turkey’s newest public library

The plane was removed from its cliffside perch five days after the incident.

Giants 400 | Oct 5, 2017

On wings of gold: Alternative financing schemes are propelling the high-flyin’ air terminals sector

The $4 billion renovation of New York City’s LaGuardia Airport is the first major U.S. aviation project delivered using a public-private partnership (P3) model.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021