flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First-of-its-kind Starbucks built in just six days

Sustainability

First-of-its-kind Starbucks built in just six days

The store is set to open in Canada in mid-March.


By David Malone, Associate Editor | March 9, 2021
Starbucks exterior building design rendering

Renderings courtesy Starbucks

A new Starbucks store is set to open in Abbotsford, B.C., that was assembled in six days with near-zero construction waste. The store was designed to reduce the energy needs for heating and cooling compared to standard construction builds.

Nexii Building Solutions, a Vancouver-based green building company, designed, manufactured, and constructed the location, which includes in-store and drive-thru options. The panels for the store’s roof and walls were designed and manufactured offsite and then assembled on-site. Nexii panels create a thermally efficient, airtight envelope, meaning the Starbucks building will require less energy to heat and cool, greatly improving energy efficiency over its building lifecycle, and lowering operating costs.

The project is meant to represent a step forward in Starbucks’ aspirations to operate more efficient stores.

 

Starbucks sustainable building graphic

Related Stories

Codes and Standards | Aug 3, 2017

ASID headquarters is first space in the world to earn both LEED and WELL Platinum Certification

Washington, D.C. office is showcase for top levels of the two standards.

Mixed-Use | Aug 3, 2017

A sustainable mixed-use development springs from a Dutch city center like a green-fringed crystal formation

MVRDV and SDK Vastgoed won a competition to redevelop the inner city area around Deken van Someren Street in Eindhoven.

Sustainability | Jul 31, 2017

Passive House practitioners aim to spread standard beyond single-family homes

Growth has been slow, but enticing larger firms and getting help from local governments could provide a boost.

Data Centers | Jul 21, 2017

Operational wellness was an objective for a new 911 call center near San Antonio

The Operations Center consolidates activities that previously were being handled at 25 locations. 

Green | Jul 18, 2017

Garden of the Four Seasons lets you experience all four seasons at once

Carlo Ratti Associati designed the garden with an innovative net-zero energy climate control system.

Sustainability | Jul 10, 2017

British Columbia receives its first WELL certified workplace courtesy of Perkins + Will

Over 100 wellness features are incorporated into CBRE’s Vancouver office.

Sustainability | Jun 29, 2017

The Dutch ‘Windwheel’ wants to create a new sustainable landmark for Rotterdam

The sustainable structure will be a mixed-use development with a hotel, apartments, and office space.

Hotel Facilities | Jun 29, 2017

Luxury, plant-covered hotel unveiled for site near the River Seine

Kengo Kuma is designing the hotel, which will feature a large garden and a plant-covered façade. 

Sustainability | Jun 28, 2017

Mohawk College will have one of the region’s first net-zero energy institutional buildings

The project’s net-zero goals led to the development of a new curtain wall system.

Hotel Facilities | Jun 28, 2017

This floating hotel in Sweden freezes in place during the winter

The hotel will feature a cold bath and be in a good location for viewing the northern lights.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021