flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First-of-its-kind Starbucks built in just six days

Sustainability

First-of-its-kind Starbucks built in just six days

The store is set to open in Canada in mid-March.


By David Malone, Associate Editor | March 9, 2021
Starbucks exterior building design rendering

Renderings courtesy Starbucks

A new Starbucks store is set to open in Abbotsford, B.C., that was assembled in six days with near-zero construction waste. The store was designed to reduce the energy needs for heating and cooling compared to standard construction builds.

Nexii Building Solutions, a Vancouver-based green building company, designed, manufactured, and constructed the location, which includes in-store and drive-thru options. The panels for the store’s roof and walls were designed and manufactured offsite and then assembled on-site. Nexii panels create a thermally efficient, airtight envelope, meaning the Starbucks building will require less energy to heat and cool, greatly improving energy efficiency over its building lifecycle, and lowering operating costs.

The project is meant to represent a step forward in Starbucks’ aspirations to operate more efficient stores.

 

Starbucks sustainable building graphic

Related Stories

Game Changers | Jan 18, 2017

Turning friction into power

Research on piezoelectricity moves closer to practical applications for infrastructure and buildings.

Game Changers | Jan 13, 2017

Building from the neighborhood up

EcoDistricts is helping cities visualize a bigger picture that connects their communities.

Sustainability | Dec 14, 2016

A floating, mobile gym powered by human energy envisioned for the Seine River

Energy created by those exercising within would power the gym down the Seine.

High-rise Construction | Dec 2, 2016

Agora Garden, a twisting, plant-filled tower in Taipei, will absorb 130 tons of carbon dioxide annually once completed

The building sits just a few blocks from the LEED-Platinum certified Taipei 101, the world’s eighth tallest building.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Sports and Recreational Facilities | Nov 14, 2016

Soccer stadium from Zaha Hadid Architects will be constructed almost entirely of wood

The architects say the project will be the greenest soccer stadium in the world once completed.

Building Technology | Nov 10, 2016

New system from MIT may help buildings monitor stress and damage over time

The computational model is being tested on MIT’s Green Building.

Resiliency | Nov 3, 2016

Future-proofing urban waterfronts

CallisonRTKL’s Nathan Cherry discusses hurricanes, the San Francisco waterfront, and how we can future-proof our urban waterfronts.

Sustainability | Nov 3, 2016

A development in Denmark looks to use agricultural waste to help power its buildings

The proposal is a mixture of agriculture and urban design.

Multifamily Housing | Oct 25, 2016

The Beacon will become the most sustainable residential tower in the world

Lumiere Developments says the building will generate enough energy to offer residents ‘Free Energy For Life.’

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021