FirstEnergy Stadium, where the Cleveland Browns play their home games, may be covered in the same cladding used on Grenfell Tower, according to the Associated Press. The cladding is being investigated as a possible accelerate in the tragic London fire that killed at least 80 people last month.
In promotional brochures on Arconic’s (the company that sells the panels) website, FirstEnergy Stadium is listed as using 100,000 sf of the cladding in question on its exterior. Additionally, the Baltimore Marriott Waterfront hotel, an Alaskan high school, Dallas-Fort Worth International Airport’s Terminal D, a nine-story mixed-use building in Denver, and six Early Development Education Centers for the Detroit Public School System are also listed as having used the cladding.
However, because in many cases the building records have been discarded, the owners, operators, contractors, and architects are unable to confirm if Arconic’s Reynobond panels were used on any of the structures in question.
A spokesman for Cleveland’s mayor would not confirm or deny if the city-owned stadium was built with the cladding in question, saying any questions would need to wait until the investigation into the Grenfell Tower fire finishes.
In the case of the Baltimore Marriott, which was constructed in 2001, an architect who worked on the project said he destroyed his building records pertaining to the property in 2011 because his contract only requires him to keep files for 10 years.
According to the AP story, the U.S buildings have not been declared unsafe and no widespread testing of aluminum paneling has been initiated by the U.S. government as of yet.
To read the entire AP story, click here.
Related Stories
| Sep 13, 2010
Second Time Around
A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.
| Sep 13, 2010
Committed to the Core
How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.
| Aug 11, 2010
New data shows low construction prices may soon be coming to an end
New federal data released recently shows sharp increases in the prices of key construction materials like diesel, copper and brass mill shapes likely foreshadow future increases in construction costs, the Associated General Contractors of America said. The new November producer price index (PPI) report from the Bureau of Labor Statistics provide the strongest indication yet that construction prices are heading up, the association noted.
| Aug 11, 2010
Kingspan insulated panels showcase net-zero energy modeling
Kingspan Insulated Panels, Inc. is demonstrating energy modeling programs to illustrate how far Envelope First Strategies could advance beyond Leadership in Energy and Environmental Design (LEED), Energy Code and the Department of Energy (DOE) Net-Zero Energy goal of 2025. Kingspan will showcase the models in their exhibit (#954) during the Greenbuild 2009 International Conference and Expo, November 11-13 in Phoenix.
| Aug 11, 2010
Using physical mockups to identify curtain wall design flaws
Part two of a five-part series on diagnosing and avoiding cladding, glazing, and roofing failures from building forensics expert IBA Consultants.
| Aug 11, 2010
Best AEC Firms of 2011/12
Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +