A November groundbreaking is scheduled for the 2.3-million-sf Oceanwide Center in San Francisco that, when completed, will be part of this city’s ambitious creation of a new Transbay neighborhood that includes more than 6 million sf of new downtown office space in a high-density commercial core surrounding the new five-story Transbay Transit Center.
The San Francisco Planning Commission has granted planning permission for Oceanwide Center, consisting of two towers—a 605-foot-high building for a hotel and residences, and an 850-foot-tall office and residential building—that will be located within a 22,000-sf lot in the South of Market Street (SOMA) district. The designers are Foster + Partners and Heller Manus Architects.
Foster + Partners states that this project will include new public spaces and pedestrian connections that are designed to support increased density, which is one of the goals of the larger Transbay development. Kathryn Gustafson of the firm Gustafson Guthrie Nichol is Oceanwide Center’s landscape architect.
The ground level of the buildings will be “lifted up” by almost five stories to provide the neighborhood with an “urban room” with walking routes cutting through the site, and leading to shops, cafes, and green spaces.
“This development will be the new exemplar of urban living with exciting places to live and work right alongside the central transport hub,” sayd Stefan Behling, Foster + Partners’ Senior Executive Partner.
Beijing-based Oceanwide Holdings acquired this site in early 2015, according to the website Hoodline.com. The plans would require tearing down three buildings. The developer also intends to renovate two existing commercial buildings on First Street. Hoodline reports that Oceanwide Center will include 265 residential units, 169 hotel rooms, 12,500 sf of ground-floor retail, and 26,000 sf of privately owned public open space.
The Transbay Redevelopment Project has three interconnected elements:
- Replacing the former Transbay Terminal at First and Mission Streets
- Extending Caltrain and California High Speed Rail underground from Caltrain’s current terminal at 4th and King Streets into the new downtown Transit Center
- Creating a new neighborhood of homes, offices, parks, and shops surround the Transit Center.
The first phase will create a new five-story Transit Center with one above-grade bus level, ground-floor, concourse, and two below-grade rail levels serving Caltrain and future California High Speed Rail. Phase I will also create new bus ramp that will connect the Transit Center to a new off-site bus storage facility and the San Francisco-Oakland Bay Bridge.
The Transit Center is designed by Pelli Clarke Pelli Architects (PCPA), and will feature a 5.4-acre park on the roof of the bus and rail station. A complementary transit tower designed by PCPA and developed by Hines will be built adjacent to the Transit Center and will provide additional financing for the project.
Aside from the new office space, other highlights of the Transbay redevelopment plan include:
- Nearly 4,400 units of new housing, 1,200 of which will be permanently affordable.
- Approximately 100,000 sf of new retail space, much of it in the Transbay Transit Center.
- Nearly 1,000 new hotel rooms.
- A dramatic new skyline punctuated by a limited number of taller buildings, including a 1,070-foot-tall Salesforce Tower, the tallest in San Francisco, adjacent to the Transbay Transit Center.
- Wide sidewalks with landscaping, lighting, seating, and pedestrian amenities.
- Mid-block crossings keyed to alleyway systems and other pedestrian safety improvements.
- Safe and convenient bicycle lanes.
- A total of more than 11 acres of new public parks and open space.
According to the San Francisco Planning Department, the Transit Center District Plan and the Transbay Redevelopment Plan will generate more than $2.7 billion in net additional public funding for the construction of the Transbay Program and affordable housing in the Transbay neighborhood. Together, the Plans will generate more than 25,000 construction job-years and 27,000 permanent jobs.
One of Oceanwide Center's towers, at 805 feet, will be the second tallest in San Francisco. Image: Foster + Partners
Related Stories
| May 15, 2012
One World Trade Center goes to new height of sustainability
One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 1, 2012
Time-lapse video: World Trade Center, New York
One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
| Apr 25, 2012
McCarthy introduces high school students to a career in construction
High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.
| Apr 25, 2012
J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University
The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 10, 2012
Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo
Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.