flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Foster + Partners’ Mexico City Airport has been cancelled

Airports

Foster + Partners’ Mexico City Airport has been cancelled

The project was set to cost $13.3 billion.


By David Malone, Associate Editor | October 31, 2018
Mexico City AIrport

Courtesy Foster + Partners

Foster + Partners’ ambitious Mexico City Airport project has officially been cancelled after 70% of voters (only 1.2% of registered voters turned out) rejected the project. The new plan is to keep the existing airport and add a terminal and two runways to a military base north of Mexico City, according to The Wall Street Journal.

 

See Also: Foster + Partners, Fernando Romero win competition for Mexico City's newest international airport

 

The original plans called for a 555,000 sm facility that would have become one of the largest airports in the world. It was also designed to be the most sustainable airport in the world, as the single terminal, which would have been enclosed within a continuous lightweight gridshell, would have used fewer materials and less energy than a cluster of buildings.

Mexico’s President-elect, Andrés Manuel López Obrador, suggested the partly-built airport structure could be repurposed as a sports and ecological center.

Tags

Related Stories

Urban Planning | Feb 5, 2024

Lessons learned from 70 years of building cities

As Sasaki looks back on 70 years of practice, we’re also looking to the future of cities. While we can’t predict what will be, we do know the needs of cities are as diverse as their scale, climate, economy, governance, and culture.

Products and Materials | Jan 31, 2024

Top building products for January 2024

BD+C Editors break down January's top 15 building products, from SloanStone Quartz Molded Sinks to InvisiWrap SA housewrap.

Airports | Jan 30, 2024

Rafael Viñoly Architects’ design for the new Florence, Italy, airport terminal will feature a rooftop vineyard

At Florence, Italy’s Aeroporto Amerigo Vespucci, the new international airport terminal will feature a fully operating vineyard on the facility’s rooftop. Designed by Rafael Viñoly Architects, the terminal is expected to see over 5.9 million passengers annually. Renderings for the project have recently been released.

Airports | Jan 15, 2024

How to keep airports functional during construction

Gensler's aviation experts share new ideas about how to make the airport construction process better moving forward.

Airports | Dec 4, 2023

4 key innovations and construction trends across airport design

Here are some of the key trends Skanska is seeing in the aviation sector, from congestion solutions to sustainability.

Giants 400 | Nov 13, 2023

Top 60 Airport Facility Construction Firms for 2023

Hensel Phelps, Turner Construction, AECOM, and Walsh Group top BD+C's ranking of the nation's largest airport terminal and airport facilities general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. 

Giants 400 | Nov 13, 2023

Top 65 Airport Facility Engineering Firms for 2023

AECOM, Jacobs, Arup, Burns & McDonnell, and WSP head BD+C's ranking of the nation's largest airport terminal and airport facilities engineering and engineering architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report.

Giants 400 | Nov 13, 2023

Top 65 Airport Facility Architecture Firms for 2023

Gensler, Corgan, PGAL, and HOK top BD+C's ranking of the nation's largest airport terminal and airport facilities architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. 

Building Materials | Oct 2, 2023

Purdue engineers develop intelligent architected materials

Purdue University civil engineers have developed innovative materials that can dissipate energy caused by various physical stresses without sustaining permanent damage.

Products and Materials | Sep 29, 2023

Top building products for September 2023

BD+C Editors break down 15 of the top building products this month, from smart light switches to glass wall systems.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021