The results of the 2011 Emporis Skyscraper Award are now in: 8 Spruce Street in New York City is the winner of the renowned architecture prize for new skyscrapers. Every year, Emporis' international jury (www.emporis.com) rewards ten skyscrapers completed in the previous calendar year. The award is being given for the 12th time.
The winners were chosen from over 220 skyscrapers completed in 2011. 8 Spruce Street, the first skyscraper by the architect Frank Gehry, and also known as The Beekman or New York by Gehry, won over the jury with its magnificent undulating stainless steel facade.
The sculptured form of Skidmore, Owings & Merrill's Al Hamra Tower earned it second place in the ranking. Despite its great height, the skyscraper fits harmoniously into Kuwait City's urban landscape. The tower is engineered to take account of climate conditions: the south facade, with limestone elements cladding a concrete wall, protects the building from the searing desert sun and impressed the jury from both architectural and functional points of view.
DBI Design's Etihad Towers were voted into third place, the jury praising the complex as a particularly harmonious ensemble of buildings. Critical to the decision were the soft, curving contours of the towers: these suggest the shape of sails and are intended to evoke Abu Dhabi's history as a port. The jury of experts also singled out the exceptional facade of silver and blue glass.
8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award. The very first award (2000) went to Sofitel New York Hotel, while Hearst Tower won the coveted architecture prize for 2006. That makes New York City, the world capital of high-rise architecture, the city to which the Emporis Skyscraper Award has most often been awarded.
Click here to view photos of the winning projects. +
Related Stories
K-12 Schools | Aug 8, 2024
New K-12 STEM center hosts robotics learning, competitions in Houston suburb
A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district.
Affordable Housing | Aug 7, 2024
The future of affordable housing may be modular, AI-driven, and made of mushrooms
Demolished in 1989, The Phoenix Ironworks Steel Factory left a five-acre hole in West Oakland, Calif. After sitting vacant for nearly three decades, the site will soon become utilized again in the form of 316 affordable housing units.
Architects | Aug 5, 2024
Mastering the art of project schedule: Expert insights on design and construction
We sat down with two experts in the design field, Ron Dick (Founding Partner and Architect) and Mike Niezer (COO and Architect), to talk about everything you need to know about the entire process.
University Buildings | Aug 1, 2024
UC Riverside’s student health center provides an environment on par with major medical centers
The University of California, Riverside's new Student Health and Counseling Center (SHCC) provides a holistic approach to wellness for students throughout the UC Riverside campus. Designed by HGA and delivered through a design-build partnership with Turner Construction Company, SHCC provides healthcare offerings in an environment on par with major medical centers.
Libraries | Aug 1, 2024
How current and future trends are shaping the libraries of tomorrow
Over the last few years, public libraries have transitioned from being buildings that only store and lend books to being fully featured community centers.
MFPRO+ News | Aug 1, 2024
Canada tries massive incentive program to spur new multifamily housing construction
Canada has taken the unprecedented step of offering billions in infrastructure funds to communities in return for eliminating single-family housing zoning.
Government Buildings | Aug 1, 2024
One of the country’s first all-electric fire stations will use no outside energy sources
Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.
Contractors | Aug 1, 2024
Nonresidential construction spending decreased 0.2% in June
National nonresidential construction spending declined 0.2% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.21 trillion. Nonresidential construction has expanded 5.3% from a year ago.
Student Housing | Jul 31, 2024
The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility
The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.
MFPRO+ New Projects | Jul 31, 2024
Shipping containers converted into attractive, affordable multifamily housing in L.A.
In the Watts neighborhood in Los Angeles, a new affordable multifamily housing project using shipping containers resulted in 24 micro-units for formerly unhoused residents. The containers were acquired from a nearby port and converted into housing units at a factory.