flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners completes mixed-use tower in R&F Yingkai Square

Mixed-Use

Goettsch Partners completes mixed-use tower in R&F Yingkai Square

The 66-story building is now the 7th tallest completed building in Guangzhou.


By David Malone, Associate Editor | August 16, 2016

Photo: © 1st Image courtesy of Goettsch Partners.

Located in the new city center of Zhujiang, Goettsch Partners (GP) recently finished work on a 971-foot, 66-story mixed-use tower. Comprising 114,500 sm of office space, 10,000 sm of retail, and a 208-key Park Hyatt hotel at the top, the R&F Yingkai Square mixed-use tower is one component of a larger master plan of mixed use towers in Guangzhou. The Park Hyatt hotel occupies the top floors of the building with the office space existing below. Below grade, subway connections are also included.

On the design front, GP derived the building’s asymmetrically carved corners and the veining of vertical strips on the façade, which compress and stretch as they rise, from local bamboo plants. The square shape of the tower was used to work in tandem with the geometric rigidity of the street grid while the carved out corners, which look as though Paul Bunyan took a swing at the building with his giant axe and chipped bits of it away, are meant to highlight unique views available at various heights overlooking a nearby central green and the Pearl River Delta.

An indoor infinity pool runs the entire length of one side of the building with views of the Guangzhou skyline and an outdoor roof garden on level 70 provides outdoor dining or relaxation space.

The mixed-use tower has already become a distinctive addition to the city’s skyline.

“With its tight urban site, diverse functions and direct connections to transit, the building has quickly made an impact,” Paul De Santis, LEED AP, Principal and Senior Designer at GP says in a press release. “The building establishes a unique silhouette in the rapidly evolving skyline.”

The building is meant to offer a unique blend of being connected to the urban street life while also providing an intimate, luxurious experience in the upper-level hotel. The Tokyo-based firm, Super Potato, designed the hotel interiors.

 

Photo: © 1st Image courtesy of Goettsch Partners.

Image courtesy of Goettsch Partners.

Hotel dropoff. Photo: © 1st Image courtesy of Goettsch Partners.

Hotel Entry. Photo: © 1st Image courtesy of Goettsch Partners.

Hotel Sky Lounge. Photo: © 1st Image courtesy of Goettsch Partners.

Hotel pool. Photo: © 1st Image courtesy of Goettsch Partners.

Hotel roof terrace. Photo: © 1st Image courtesy of Goettsch Partners.

Photo: © 1st Image courtesy of Goettsch Partners.

Related Stories

Mixed-Use | Jun 13, 2019

Site of former Motorola headquarters will become a mixed-use district

UrbanStreet Group and Antunovich Associates are developing the master plan for the project.

Mixed-Use | Jun 3, 2019

12-story mixed-use development opens in Washington, D.C.

Cooper Carry designed the project.

Mixed-Use | May 28, 2019

Broward County Convention Center expansion to include Headquarters Hotel

Omni Hotels & Resorts will manage the County-owned hotel.

Mixed-Use | May 23, 2019

237-room hotel will anchor Nashville’s new $540 million mixed-use development

Chartwell Hospitality will operate the hotel.

Mixed-Use | May 15, 2019

Puerto Rican mixed-use, mixed income housing development begins construction

Álvarez-Díaz & Villalón designed the project.

Mixed-Use | May 14, 2019

Mixed-use community breaks ground in Greenville, S.C.

The Beach Company is developing the project.

Mixed-Use | May 9, 2019

Development builds on success of Chicago’s River North

One Chicago will further enliven upscale, artsy area.

Mixed-Use | May 3, 2019

The Colorado Rockies get into the sports-anchored development game

The project is currently under construction across the street from Coors Field.

Mixed-Use | May 2, 2019

A series of green bridges will connect these two towers in Shenzhen, China

Steven Holl Architects designed the project.

Mixed-Use | Apr 26, 2019

Miami’s 7-acre Link at Douglas breaks ground

The project will be built in phases over the next five years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021