flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners to design three-building Optics Valley Center complex

High-rise Construction

Goettsch Partners to design three-building Optics Valley Center complex

The Chicago-based firm won a design competition to design the complex located in Wuhan, China.


By David Malone, Associate Editor | May 23, 2017

Rendering courtesy of Goettsch Partners.

A new complex coming to Wuhan, China will provide nearly 3.4 million sf of space across three buildings. At the core of the new Optics Valley Center, will stand a 400-meter-tall office tower.

Designed by Chicago-based Goettsch Partners, the tower combines rounded corners with a taper that will work together to reduce wind pressures on the structure. Exterior shades wrap the building and create a rhythmic pattern. According to the architect, the use of color in the façade is meant to reinforce the digital rhythm and provide a subtle reference to the local technology culture.

The tower will be built on two main parcels of land to the southeast of the Wuhan city center. A green belt will run through the heart of the new district and ensure natural light and parkland will be available for all of the structures.

Two new subway lines will provide access to the parcels and a new commuter node will become the epicenter of activity and ensure immediate integration into the broader city.

Greenland Group is developing the project, which hopes to achieve LEED Gold certification. Currently, the development is scheduled to open in 2022.

 

Rendering courtesy of Goettsch Partners.

 

Rendering courtesy of Goettsch Partners.

Related Stories

High-rise Construction | Jan 18, 2019

‘Paramount’ will become Nashville’s tallest tower

Goettsch Partners is the project’s architect.

High-rise Construction | Jan 14, 2019

AS+GG-designed tower will be the tallest in China

The tower is at the center of the Shimao Longgang Master Plan.

High-rise Construction | Jan 10, 2019

Indoor-outdoor amenities open leasing value at a San Francisco skyscraper

The amenities that set this 605-foot-tall building apart are its 50,000 sf of outdoor and open spaces that include 14 skydecks and large terraces on its 12th and 28th floors.

High-rise Construction | Dec 13, 2018

Record number of 'supertall' towers were completed in 2018

Citic Tower in Beijing and Vincom Landmark 81 in Ho Chi Minh City are among 18 "supertall" skyscrapers completed this year—a record number, according to the Council on Tall Buildings and Urban Habitat. 

High-rise Construction | Aug 27, 2018

The world’s tallest buildings with dampers

The CTBUH created the list as part of a recent study.

High-rise Construction | Aug 8, 2018

Bjarke Ingels Group’s new Shenzhen tower includes a folded building envelope

The new skyscraper is the home of Shenzhen Energy Company.

Multifamily Housing | Aug 7, 2018

Even after redevelopment, the iconic 'Chicago Tribune' sign will remain at 435 N. Michigan Ave.

The newspaper and the building's new owners reached a settlement.

Lighting | Aug 1, 2018

Willis Tower upgrades antenna lighting

The new lights will save Willis Tower more than 70% in antenna-lighting energy costs.

High-rise Construction | Jul 31, 2018

A 350-foot waterfall splashes down from a skyscraper in China

The tower is located in Guiyang’s central business district.

High-rise Construction | Jul 10, 2018

SOM-designed 100 Leadenhall Street will be one of the tallest buildings in the U.K.

The tower will rise in the City of London’s eastern cluster.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021