The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Energy, recently released a new Request For Information (RFI) focused on enabling energy efficiency and decarbonization in commercial buildings.
GSA wants to test innovative technologies through GSA’s Center for Emerging Building Technologies. As part of GSA’s Center for Emerging Building Technologies, new clean energy and decarbonization technologies will be tested in federal buildings.
The Center consists of three interconnected programs: the Green Proving Ground, the Applied Innovation Learning Lab, and Pilot to Portfolio. By testing new building technologies in federal buildings, these programs will help GSA make smarter investments and enable and encourage wider market adoption of clean energy innovations, according to a GSA news release.
The new RFI seeks to identify emerging and sustainable technologies in the following categories:
- Deep Energy Retrofits
- All-Electric Buildings and All-Electric Vehicle Fleets
- Healthy and Resilient Buildings
- Low-Embodied Carbon Building Materials
- Net-Zero Operations
- Packages of Emerging and Sustainable Technology Solutions
Submissions must be technologies and solutions that are technically and commercially ready for evaluation in occupied, operational buildings. The government will pilot selected technologies.
Related Stories
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.
| Nov 16, 2011
Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.
This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.
| Nov 10, 2011
Skanska Moss to expand and renovate Greenville-Spartanburg International Airport
The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will