flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Henning Larsen designs an active community hub for London

Mixed-Use

Henning Larsen designs an active community hub for London

The project will be the firm’s first in London.


By David Malone, Associate Editor | June 7, 2021
105 Victoria Street ground floor amenities

Renderings: DBOX

105 Victoria Street, located just a short walk from Buckingham Palace, will be Henning Larsen’s first project in London. The mixed-use project will include office space, a reinterpretation of the typical commercial foyer as an urban plaza, and a variety of indoor and outdoor amenities that will enable a more active workday.

The 470,000-sf building will replace a traditional foyer and reception area on the ground floor with a covered plaza, dubbed the Village Square. This large community hall will angle through the ground level and be flexibly outfitted with stalls to allow it to adapt to various building and city events.

 

105 Victoria Street event space

 

The Village Square is designed to be a vibrant market hall that creates a natural short cut through the city. It will have the ability to accommodate live music events, fashion shows, art exhibitions, and sports. A market, retail stores, and co-working spaces will exist within the Square continuously.

 

105 Victoria Street stair and bike path

 

A winding staircase and bicycle ramp will wrap around a small pocket of indoor grocery and connect the Village Square with underground bicycle parking, a workshop, a gym, and a multi-purpose event and conference hall. Additionally, a looped indoor and outdoor walk and talk track on the 10th floor will connect a range of amenities and functions with landscaped terraces.

The project is designed to meet BREEAM ‘Outstanding’ standards and reach net zero embodied carbon by 2026. Henning Larsen is designing 105 Victoria Street in collaboration with Adamson Associates Architects and KPF.

 

105 Victoria Street ground floor retail

Tags

Related Stories

Mixed-Use | Oct 7, 2024

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021