105 Victoria Street, located just a short walk from Buckingham Palace, will be Henning Larsen’s first project in London. The mixed-use project will include office space, a reinterpretation of the typical commercial foyer as an urban plaza, and a variety of indoor and outdoor amenities that will enable a more active workday.
The 470,000-sf building will replace a traditional foyer and reception area on the ground floor with a covered plaza, dubbed the Village Square. This large community hall will angle through the ground level and be flexibly outfitted with stalls to allow it to adapt to various building and city events.
The Village Square is designed to be a vibrant market hall that creates a natural short cut through the city. It will have the ability to accommodate live music events, fashion shows, art exhibitions, and sports. A market, retail stores, and co-working spaces will exist within the Square continuously.
A winding staircase and bicycle ramp will wrap around a small pocket of indoor grocery and connect the Village Square with underground bicycle parking, a workshop, a gym, and a multi-purpose event and conference hall. Additionally, a looped indoor and outdoor walk and talk track on the 10th floor will connect a range of amenities and functions with landscaped terraces.
The project is designed to meet BREEAM ‘Outstanding’ standards and reach net zero embodied carbon by 2026. Henning Larsen is designing 105 Victoria Street in collaboration with Adamson Associates Architects and KPF.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.