flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA renovates Rowing Center at Cornell University

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.


By By BD+C Staff | December 19, 2011
The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower roo

The Cornell University Rowing teams have been on a winning streak recently. Since 2006, the men’s lightweight crew has won threeIRA (Intercollegiate Rowing Association) national championship crowns while the men’s heavyweight and women’s teams have medaled at national regattas and continued to improve their competitive standing.

Now the teams have an expanded Rowing Center to match their athletic gains.

Designed by HGA Architects and Engineers (HGA), Cornell’s updated Rowing Center overlooking Lake Cayuga in Ithaca, N.Y, repositions two existing boathouses into an advanced training facility that competes with the best in the nation.

Cornell’s crews include approximately 150 athletes on three teams—Men’s Heavyweight, Men’s Lightweight, and Women’s. The rowing facility had consisted of the two-story, 15,000-square-foot Collyer Boathouse built in 1957 for the men’s teams, and the adjacent one-story, 5,000-square-foot Robison Boathouse built in 1979 for the women’s team.

While serving their purpose well over the years, the boathouses lacked the infrastructure to fully support the growing teams—especially compared to newer facilities by competitors. The women’s crew, for instance, had tripled since it became a varsity team in the 1970s, yet the locker rooms were one-third the size of the men’s. In addition, neither building had adequate boat storage or indoor training equipment, with the crews splitting training between the Cayuga Inlet and Teagle Hall Fitness Center.

Cornell conducted an earlier study that recommended razing the boathouses for a new facility. However, when funding sources weren't adequate for this plan, the college cut back and looked for other options. Working with HGA, Cornell was able to arrive at a solution that fit the needs of the school, the athletic department, and the crews.

The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower rooms,  laundry facility, a Tradition Room displaying crew memorabilia, and meeting spaces. It is connected to the Collyer Boathouse via a two-story entrance lobby with a second-floor bridge. An outdoor gathering space connects to the lobby.

Collyer’s second-floor has been converted to a multi-purpose training room with state-of-the-art exercise equipment and weightlifting stations. The first level houses boat storage, waterfront offices for coaches, a water safety room, and repair bay.

Robison Boathouse, meanwhile, was cleared of its outdated locker room and offices and now functions solely as rowing shell and equipment storage. Doors were added to the backside of both original buildings to allow the teams to load shell trailers for event travel from the parking lot. The new door at Collyer even allows the teams to pull a loaded trailer into the boat bay in December to streamline departures for winter training. A new launch storage building completes the set of three structures.

Throughout Collyer and the addition, large windows overlook the water and oversized graphics and bold red accents emphasize Big Red traditions. The locker rooms include off-the-shelf resin lockers customized with integral venting and on-demand heating to allow the staff to dry damp rowing gear overnight and exhaust odors fully within the locker.

Exterior upgrades work within the existing buildings’ style and massing. HGA replaced wooden doors with glass doors to open the interior to views of the water, replaced and reconfigured upper windows, repaired stonework, and added metal standing-seam roofs over the three structures to architecturally unify them and provide durable performance over the long term. The crisp existing color palette of nautical white paint, local bluestone accent panels and Cornell Red trim was restored and extended to the addition.

The site itself presented structural challenges due to the soft load-bearing soil conditions. With marginal soil-bearing capacity and bedrock far below affordable levels to reach with piers, HGA's team designed a system that pre-loaded the site to force settlement before pouring a three-foot-thick concrete-slab mat foundation for the addition. New structural framing for the addition cantilevers toward Collyer without actually bearing on the existing structure.

And while Collyer was structurally sound, HGA reinforced the joists on the second level to support increased capacity for the weight-lifting stations.

The project provides significant savings for the Athletic Department through a number of sustainable features, including an upgraded exterior envelope with added insulation and thermal-pane windows, energy-efficient fixtures, room occupancy sensors, lighting control systems, and an air-to-air heat exchanger to temper the high fresh air loads. In addition, the tight site integrates native plantings and pervious pavement to treat surface storm water and creates a right-of-way for the Cayuga Waterfront Trail, a public bike/pedestrian path.

Since its dedication this summer, the Rowing Center has proved a winner on all counts. The Athletic Department has a cost-efficient facility that provides effective training and team support, adds much-needed boat storage, upholds the University’s gender equity standards, preserves the heritage of the existing structures, and provides an outstanding environment for recruiting and alumni events.

HGA directed architecture, interior, structural, mechanical and electrical services. HGA’s project team included d’Andre Willis, AIA, principal and project manager; Loren Ahles, FAIA, project lead designer; Kendra Beaubien, AIA, project architect; Kevin Allebach, RA, project architect; Amy Tasch, LEED AP, interior designer; Sarah Jorczak, PE, structural engineer; Lance Kempf, PE, mechanical engineer; and Ben Gutierrez, electrical. The team also included Welliver McGuire, Inc., general contractor; CHA, civil engineer; and CHA, landscape architect. BD+C

Related Stories

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

MFPRO+ News | Aug 14, 2024

Report outlines how Atlanta can collaborate with private sector to spur more housing construction

A report by an Urban Land Institute’s Advisory Services panel, commissioned by the city’s housing authority, Atlanta Housing (AH), offered ways the city could collaborate with developers to spur more housing construction.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

Sustainability | Aug 14, 2024

World’s first TRUE Zero Waste for Construction-certified public project delivered in Calif.

The Contra Costa County Administration Building in Martinez, Calif., is the world’s first public project to achieve the zero-waste-focused TRUE Gold certification for construction. The TRUE Certification for Construction program, administered by Green Business Certification Inc. (GBCI), recognizes projects that achieve exceptional levels of waste reduction, reuse, and recycling.

Modular Building | Aug 13, 2024

Strategies for attainable housing design with modular construction

Urban, market-rate housing that lower-income workers can actually afford is one of our country’s biggest needs. For multifamily designers, this challenge presents several opportunities for creating housing that workers can afford on their salaries.

University Buildings | Aug 12, 2024

Planning for growing computer science programs

Driven by emerging AI developments and digital transformation in the business world, university computer science programs are projected to grow by nearly 15% by 2030.

Energy Efficiency | Aug 9, 2024

Artificial intelligence could help reduce energy consumption by as much as 40% by 2050

Artificial intelligence could help U.S. buildings to significantly reduce energy consumption and carbon emissions, according to a paper by researchers at the Lawrence Berkeley National Laboratory.

Sponsored | Healthcare Facilities | Aug 8, 2024

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.

Office Buildings | Aug 8, 2024

6 design trends for the legal workplace

Law firms differ from many professional organizations in their need for private offices to meet confidentiality with clients and write and review legal documents in quiet, focused environments

Data Centers | Aug 8, 2024

Global edge data center market to cross $300 billion by 2026, says JLL

Technological megatrends, including IoT and generative AI, will require computing power to be closer to data generation and consumption, fueling growth of edge IT infrastructure, according to a new JLL report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021