How does your hospital stack up? Grumman/Butkus Associates 2016 Hospital Benchmarking Survey

Market Data

How does your hospital stack up? Grumman/Butkus Associates 2016 Hospital Benchmarking Survey

Report examines electricity, fossil fuel, water/sewer, and carbon footprint.


By Grumman/Butkus Associates | February 16, 2017

Hospitalsā€™ energy costs per square foot (red boxes) have fluctuated greatly since 1999. Energy use intensity (Btu/sf/year) and energy costs (ft2/year) fell slightly in 2015. Chart Ā©2016 Grumman/Butkus Associates.

Grumman/Butkus Associates, a firm of energy efficiency consultants and sustainable design engineers, recently released the results of itsĀ 2016 Hospital Energy and Water Benchmarking Survey,Ā focusing on healthcare facilitiesā€™ resource usage trends and costs for calendar year 2015.

Since G/BA initiated the survey more than 20 years ago, hospitalsā€™ overall fossil fuel use has trended downward, but electricity use isnā€™t declining as much. The average combined Btu/ft2Ā (electricity plus gas/steam) for participating facilities was 237,998 in CY2015, slightly down from 239,591 in CY2014.

Square-foot prices for gas/steam were down significantly year-to-year ($0.82 in 2015, compared with $1.02 in 2014), but square-foot prices for electricity rose ($2.28 in 2015, vs. $2.16 in 2014). The overall result is that hospitalsā€™ total ft2Ā costs for energy (gas/steam plus electric) declined: $3.11 for 2015, compared with $3.18 for 2014.

Hospitalsā€™ average carbon footprint has remained fairly steady at about 60 pounds of CO2Ā equivalent per ft2Ā per year since G/BA began calculating carbon data in 1999. ā€œIf we are going to address the very daunting issue of climate change, the healthcare industry must make greater strides in reducing its carbon footprint,ā€ says Dan Doyle, G/BA Chairman. ā€œAs the trend data shows, not enough progress is being made so far.ā€

Participating facilities displayed a broad range of usage patterns. For instance, some participants are using more than 200,000 BTU/ft2Ā in fossil fuel annually, compared with a general mid-range of facilities (about 130,000 BTU/ft2/year) and those that used least (75,000 BTU/ft2/year or less). Similarly, a few hospitals consume more than 40 kWh/ft2/year in electricity, compared with a mid-range of about 25 kWh/ft2/year. A few squeaked by with less than 18 kWh/ft2.

ā€œFacilities that have high unit costs for energy should view this as an opportunity,ā€ says Doyle. ā€œFor example, an energy conservation project that would have a five-year payback at an ā€˜averageā€™ facility may have a payback of just 2.5 or 3 years at a facility with higher unit costs for energy.ā€

Hospital water/sewer use is also gradually declining, currently averaging about 45 gallons per square foot per year (compared with nearly 70 gallons/ ft2/year a decade ago). Costs for water/sewer are rising, however, now averaging $0.39/ft2. As recently as 2007, hospitals were paying about $0.27/ft2.Ā ā€œG/BA expects the trend of rising water and sewer costs to continue,ā€ says Doyle. ā€œPrice hikes not only reflect increasing costs to extract and treat the water, but also the fact that cash-strapped governmental entities may view water as a revenue source.ā€

Since 1995, the G/BA survey has provided a free annual benchmarking resource. Hospitals are invited to participate by submitting responses to a short list of questions. Information for this edition was provided by 137 hospitals located in Illinois (56), Wisconsin (31), Michigan (29), Indiana (10), and six other states.

Full results and analysis, as well as information about participating in the 2017 survey (2016 data), are available at the firmā€™s website:Ā grummanbutkus.com/HES. For additional information, contact Dan Doyle (ddoyle@grummanbutkus.com) or Julie Higginbotham (jhigginbotham@grummanbutkus.com).

Ā 
boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of ā€œprintingā€ structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the worldā€™s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā