111 East Grand, a 66,800-sf, four-story multi-use building, is currently under construction in Des Moines. The building is the largest dowel laminated timber (DLT) project in North America. DLT, manufactured by StructureCraft, will be used for the floor and roof assemblies. The columns and beams will be made from glue laminated timber.
DLT panels are made from stacked softwood lumber boards that are friction-fit together using hardwood dowels. DLT doesn’t contain any glue, VOCs, or metal nails, meaning there is no off-gassing.
See Also: First mass timber panel made from structural composite lumber gets APA certification
The project is a collaborative development between JSC Properties, Rypma Properties, Christensen Development, and Ryan Companies. In addition to working on the project, Ryan Companies will also be one of the building’s first tenants as the firm will move its Des Moines office team into the project. Three additional tenants have secured leases as well: Neumann Monson Architects (the architect of record for the project), St. Kilda Surf + Turf, and West Financial Advisors.
The project is slated for completion in Spring 2019.
Related Stories
| Aug 11, 2010
Great Solutions: Products
14. Mod Pod A Nod to Flex Biz Designed by the British firm Tate + Hindle, the OfficePOD is a flexible office space that can be installed, well, just about anywhere, indoors or out. The self-contained modular units measure about seven feet square and are designed to serve as dedicated space for employees who work from home or other remote locations.