flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Las Vegas’ $7.9 billion ‘mini-city’ will be a ‘digital revolution in motion’

Mixed-Use

Las Vegas’ $7.9 billion ‘mini-city’ will be a ‘digital revolution in motion’

All of the project’s buildings will be net-zero.


By David Malone, Associate Editor | August 14, 2019

Courtesy Bleutech Properties

Set to break ground in December 2019 and take six years to build, Bleutech Park will be a $7.5 billion project that will be constructed of net-zero buildings within their own insular mini-city.

This mixed-use mini-city will feature automated multi-functional designs; renewable energies from solar, wind, water, and kinetic; autonomous vehicles; artificial intelligence; augmented reality; Internet of Things; robotics; supertrees; and self-healing concrete structures. Bleutech park will include workforce housing, offices, retail space, luxury  residential, hotel space, and entertainment space.

 

See Also: Calgary’s sports and entertainment district will include the Calgary Flames’ new arena

 

Workforce housing is Bleutech park’s new approach to tackling affordable housing. It will serve the housing needs of people employed in jobs that the general population relies upon to make the community economically viable, such as nurses, police officers, teachers, firemen, and others with a description of service to their communities.

In total, the project is expected to create over 25,000 jobs and provide on the job training programs to train the construction workforce of the future.

Tags

Related Stories

Hotel Facilities | Apr 29, 2015

OMA unveils design for the Netherlands' largest hotel

Once completed, and if approved, the structure will add three stacked cubes to the Amsterdam skyline.

High-rise Construction | Apr 23, 2015

Size matters in NYC, where several projects vie for the city’s tallest building honor

The latest renderings of 217 West 57th Street show a tower that would rise higher than the World Trade Center’s pinnacle, when elevations are included.

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

Hotel Facilities | Apr 13, 2015

Figure-eight shaped hotel to open around PyeongChang 2018 Winter Olympics Facility

Just three miles away from the Olympic stadiums, the hotel will be a hub of its own.

Mixed-Use | Apr 7, 2015

$100 billion 'city from scratch' taking shape in Saudi Arabia

The new King Abdullah Economic City was conceived to diversify the kingdom's oil-dependent economy by focusing more in its shipping industry.

High-rise Construction | Mar 24, 2015

Timber high-rise residential complex will tower over Stockholm waterfront

The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

High-rise Construction | Mar 11, 2015

Must see: Firm proposes skyscraper with a ‘twist’ in downtown Tulsa

Tulsa, Okla.-based architecture practice Kinslow, Keith & Todd released renderings of a skyscraper concept that takes the shape of a tornado.

Modular Building | Mar 10, 2015

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021