A recent large scale renovation and addition to the Loma Linda University Medical School in Murrieta, Calif., culminated in a 273,207-sf facility for the new Loma Linda University Medical Center, adding more than 100 beds to the existing facility. One of the tallest buildings in the Inland Empire region, the building includes a 19-bed emergency room, intensive care unit, labor and delivery center, and a specialty children's hospital.
Designers for the building aimed to create a positive environment for patients and visitors, and wanted to let in as much natural daylight as possible. Various metal products from Centria were selected to create a dramatic and influential aesthetic without sacrificing performance. The Formawall Dimension Series, the only wall system that provides both advanced thermal and moisture protection in a single panelized component, was installed to help create a wall with superior thermal efficiency and moisture control, helping the medical center keep on track with its two-year construction goal.
Also selected were Formavue windows, designed to integrate seamlessly with the Formawall Dimension Series. The windows accommodate a variety of fenestrations and construction types, and feature a standard thermal break for enhanced thermal performance.
The Building Team: Davis Stokes Collaborative (architect), Layton Construction Co. Inc. (contractor), A.C. Dellovade Inc. (Centria dealer/installer). +
Related Stories
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 17, 2012
Princeton Review releases “Guide to 322 Green Colleges”
The guide profiles 322 institutions of higher education in the U.S. and Canada that demonstrate notable commitments to sustainability in their academic offerings, campus infrastructure, activities and career preparation.
| Apr 16, 2012
University of Michigan study seeks to create efficient building design
The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 3, 2012
Product Solutions
Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.
| Mar 28, 2012
Meridian Design Build Begins work on 38 acre redevelopment project
The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.