A recent large scale renovation and addition to the Loma Linda University Medical School in Murrieta, Calif., culminated in a 273,207-sf facility for the new Loma Linda University Medical Center, adding more than 100 beds to the existing facility. One of the tallest buildings in the Inland Empire region, the building includes a 19-bed emergency room, intensive care unit, labor and delivery center, and a specialty children's hospital.
Designers for the building aimed to create a positive environment for patients and visitors, and wanted to let in as much natural daylight as possible. Various metal products from Centria were selected to create a dramatic and influential aesthetic without sacrificing performance. The Formawall Dimension Series, the only wall system that provides both advanced thermal and moisture protection in a single panelized component, was installed to help create a wall with superior thermal efficiency and moisture control, helping the medical center keep on track with its two-year construction goal.
Also selected were Formavue windows, designed to integrate seamlessly with the Formawall Dimension Series. The windows accommodate a variety of fenestrations and construction types, and feature a standard thermal break for enhanced thermal performance.
The Building Team: Davis Stokes Collaborative (architect), Layton Construction Co. Inc. (contractor), A.C. Dellovade Inc. (Centria dealer/installer). +
Related Stories
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Jan 3, 2012
Gensler: 'The One Firm Firm'
The giant architecture firm succeeds by giving each of its more than 3,000 employees the opportunity for career growth and professional leadership.
| Dec 20, 2011
BCA’s Best Practices in New Construction available online
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 29, 2011
First EPD awarded to exterior roof and wall products manufacturer
EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact.