flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marriott has the largest construction pipeline of any franchise company in the U.S.

Hotel Facilities

Marriott has the largest construction pipeline of any franchise company in the U.S.

Marriott has the most rooms currently under construction with 482 Projects/67,434 Rooms.


By Lodging Econometrics | September 6, 2017
Rooms lining a hotel hallway

Pixabay Public Domain

Marriott International currently has the largest construction pipeline of any franchise company with 1,288 Projects/166,096 Rooms. Their largest brands in the Pipeline are: Fairfield Inn with 283 Projects/27,244 Rooms, Residence Inn with 187 Projects/23,617 Rooms and TownePlace Suites with 184 Projects/18,757 Rooms.

Marriott has the most rooms currently Under Construction with 482 Projects/67,434 Rooms, which represents almost 1/3 of all Pipeline rooms Under Construction. Additionally, they have the most rooms Scheduled to Start Construction in the Next 12 Months with 619 Projects/76,451 Rooms. Marriott also has 187 Projects/22,211 Rooms in Early Planning,

In the first half of the year, Marriott opened 120 new hotels with 14,071 rooms, accounting for 27% of all new hotels opened this year. The Marriott brands with the largest number of new hotels opened this year are Fairfield Inn with 31 Hotels/2,887 Rooms and Courtyard with 18 Hotels/2,104 Rooms.

Related Stories

| Nov 2, 2011

John W. Baumgarten Architect, P.C, wins AIA Long Island Chapterā€˜s Healthcare Award for Renovation

The two-story lobby features inlaid marble floors and wood-paneled wainscoting that pays homage to the buildingā€™s history.

| Sep 26, 2011

Energy efficient LED flat panels installed at N.Y. metro hospitals

LED Flat Panels deliver fully dimmable, energy efficient high quality lighting with even, shadow-free distribution, and excellent 85 Color Rendering Index.Ā 

| Sep 23, 2011

Curtainwall faƧade installation at Ohio State Cancer and Critical Care facility

A sophisticated curtainwall facade will be installed at the new OSU Cancer and Critical Care facility.

| Sep 14, 2011

Insulated metal wall panels adorn Pennsylvania hospital

The $40 million, 80,000 sf medical office building includes more than 7,000 sf of architectural flat insulated metal wall panels.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > Youā€™ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 7, 2011

KLMK Group awarded contract with Louisianaā€™s Slidell Memorial Hospital

The renovation will include a 56,000-sf Emergency Room/Cardiology Expansion.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of ā€œprintingā€ structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the worldā€™s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā