McCarthy Building Companies began construction on the new $72.7 million Bob Hope Airport Regional Intermodal Transportation Center (RITC). The facility, which broke ground on July 6, 2012, is being built to provide seamless connectivity for airport, train and bus passengers, as well as rental car customers and bicyclists.
The 520,000-sf project includes construction of a three-level consolidated rental car parking structure with a car wash and fueling system; a rental car customer service building; and a ground level bus transit station for MTA, Burbank Bus, Amtrak and charter/shuttle buses. The bus station features an open air design complemented by 16 art panels adorning all three levels of the structure.
Work also entails construction of an elevated, 1,100 foot-long moving walkway which will transport rental car customers and rail and bus passengers between the RITC and airport terminal.
As part of the project design intended to meet LEED (Leadership in Energy and Environmental Design) Silver certification standards, sustainable construction methods such as maintaining proper indoor air quality, utilizing local labor and materials and recycling construction waste will be employed. Solar panels generating roughly 1.5 megawatts of clean energy will be installed on top of the RITC by the City of Burbank.
The design-build RITC project features a pre-engineered metal roof, and two post-tensioned concrete deck and beam systems, each approximately 185,000 square feet. Like the moving walkway, it will be base-isolated with triple-pendulum bearings designed to resist a maximum credible earthquake. In the event of a disaster, the facility will serve as an emergency response center.
The 141 isolators will be placed about 10 feet above ground, which Liu said will not only be rare, but also challenging. “We usually encounter earthquake isolator installation at grade level,” he said. “Having the isolator 10 feet in the air will make the setting and grouting more challenging. The bearing plate has to be set perfectly level and the bolt holes on the base plate have a very tight tolerance. Close supervision on leveling and alignment of the plates are critical to ensure quality and accuracy as repair can be costly.”
Scheduled for completion in summer 2014, the project is located along Empire Avenue directly across from the Bob Hope Airport Train Station, on a 20-acre site formerly used as a parking lot. A separate parking structure (not a part of McCarthy’s RITC project) is being built at the airport to replace auto parking spaces currently located on land that will become the site of the center.
Some of the major project consultants involved in the Bob Hope Airport Regional Intermodal Transportation Center include: GKK/STV – Construction Manager; PGAL (Pierce Goodwin Alexander & Linville) – Architect; McCarthy Building Companies – General Contractor; Miyamoto – Structural Engineer; Saiful Bouquet – Design/Build Structural Engineer; JMC2 Civic Engineering & Surveying – Civil Engineer; PBS Mechanical and Electrical Consulting Engineers – Electrical Engineer; PBS Mechanical and Electrical Consulting Engineers – Mechanical Engineer; and Anil Verma Associates, Inc. – Landscape Architect. +
Related Stories
Design Innovation Report | Jun 25, 2019
2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art
9 projects that push the limits of architectural design, space planning, and material innovation.
Airports | May 20, 2019
How the Internet of Things will transform airport environments
Connected devices and their wealth of data have led to significant improvements in operational efficiency and passenger experience in airports.
Hotel Facilities | May 16, 2019
JFK’s TWA Flight Center has been reimagined as a hotel
MCR and Morse Development spearheaded the project.
Airports | May 9, 2019
Paine Field-Snohomish County Airport’s new terminal culminates early plan
$40 million redevelopment brands hub as true boutique airport.
Airports | May 1, 2019
The Ilan and Asaf Ramon International Airport opens in Israel’s Negev Desert
Amir Mann-Ami Shinar Architects and Planners designed the facility in partnership with Moshe Zur Architects.
Airports | Apr 1, 2019
Home team wins O’Hare terminal design competition
Studio ORD, which includes Chicago-based Studio Gang, is chosen from five finalists.
Airports | Mar 21, 2019
First photos inside the nearly completed Jewel Changi Airport addition
The addition is set to open this spring.
Airports | Feb 28, 2019
Renovation of Tampa International Airport’s Main Terminal completes
Skanska and HOK led the design-build team.
Airports | Feb 26, 2019
Design team unveils Terminal Modernization Program at Pittsburgh International Airport
The terminal’s design philosophy combines nature, technology, and community.
Airports | Feb 21, 2019
Self-service bag drops and the challenges of speeding up airport baggage check-in
More airports are asking passengers to check their own baggage. What’s the ripple effect?