When Dennis Fula took over responsibility for the Milwaukee Public School System’s (MPS) roof maintenance more than twenty years ago, many of the school buildings were threatened with closure due to unsafe conditions. Determined to ensure the city’s students had safe roofs over their heads, Dennis partnered with Dan Dalle Nogare and the team at Atlas Roofing Corporation to solve those safety concerns, reduce maintenance costs and extend the life of the historic school buildings.
Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students. After years of wear and tear from the harsh Wisconsin winters, the buildings’ roofs were in terrible shape, with some in threat of condemnation. Previously, the maintenance department had used short-term fixes by adding material to leaky roofs, ultimately worsening problems throughout the entire building network. Dennis realized the school system needed a long-term solution to their roofing problems and was able to successfully recommend the implementation of the Atlas Certified Drainage Program (CDP™).
CDP is a comprehensive service for low slope tapered roofs designed to eliminate ponding water on a roof’s surface. The program’s designs help to prevent structural roof collapse, moisture invasion, membrane degradation, loss of thermal resistance, ice formation, vegetation growth and voiding system warranty. The Atlas CDP team worked on site with the MPS maintenance crew to map each roof in the school system and design custom drainage solutions specific to every individual building. While some building materials manufacturers will give a 25-year warranty, CDP ensures positive slope and drainage, which helps extend the life of the roof beyond a typical warranty. With proper maintenance and care, the MPS roofing system can last for 40 years.
By utilizing the Atlas Roofing Corporation’s Certified Drainage Program, the Milwaukee Public School System team saved on time and labor in addition to extending the life of each roof by at least 10–15 years, and in some cases more than 20. In fact, before implementing the CDP system, each school was only getting 20, 15 or as few as 10 years out of a roofing surface. Now the MPS team expects their roofs to last at least 30 years. According to the team, since implementing this system over 20 years ago, they still have yet to replace a roof with the new CDP system installed.
While maintenance is still required, the number of repairs needed is reduced each year. Before utilizing the CDP, the MPS team would find 200–400 leaks to inspect after rain and now, they are dealing with an average of only 20–30 leaks per building, of which only a fraction are leaks caused by the roof. The MPS team is incredibly proud of the program’s success and of the unprecedented support from Atlas Roofing Corporation. According to the MPS team, “You’d hardly know these roofs are 20 years old… they look good as new.”
To read the full case study, please visit http://www.atlasrwi.com/casestudies/mps/.
Related Stories
| Apr 24, 2012
Roofing Supply Group acquired by Clayton, Dubilier & Rice
RSG provides a complete offering of residential and commercial roofing materials and related supplies.
| Apr 20, 2012
RCMA and Oak Ridge National Laboratory to host International Roof Coatings Conference
The International Roof Coatings Conference will feature keynote speakers Marc LaFrance of the U.S. Department of Energy, and Art Rosenfeld of the Lawrence Berkeley National Laboratory.
| Apr 20, 2012
Registration open for Solar Power International 2012 in Orlando
President Bill Clinton to deliver keynote address at ?largest solar energy event in the Americas.
| Apr 3, 2012
Meyer receives RCMA's Martin A. Davis Industry Leadership Award
The Martin A. Davis Industry Leadership Award is presented annually to an individual, selected by his or her peers, who has exemplified outstanding service and made significant contributions to the roof coatings industry.
| Mar 22, 2012
Hawaiian architecture firm chooses FRP trellis system over traditional materials
MGA Architecture plans to add five more trellis systems on the neighboring building.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 20, 2012
GAF introduces web portal for architects and specifiers
The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.
| Feb 16, 2012
4.8-megawatt solar power system completed at Jersey Gardens Mall
Solar array among the largest rooftop systems in North America.