flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Milwaukee Public Schools adopt innovative roof drainage system from Atlas to extend life of school buildings

Sponsored Content Roofing

Milwaukee Public Schools adopt innovative roof drainage system from Atlas to extend life of school buildings

Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students.


By Atlas | April 12, 2017

When Dennis Fula took over responsibility for the Milwaukee Public School System’s (MPS) roof maintenance more than twenty years ago, many of the school buildings were threatened with closure due to unsafe conditions. Determined to ensure the city’s students had safe roofs over their heads, Dennis partnered with Dan Dalle Nogare and the team at Atlas Roofing Corporation to solve those safety concerns, reduce maintenance costs and extend the life of the historic school buildings.

Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students. After years of wear and tear from the harsh Wisconsin winters, the buildings’ roofs were in terrible shape, with some in threat of condemnation. Previously, the maintenance department had used short-term fixes by adding material to leaky roofs, ultimately worsening problems throughout the entire building network. Dennis realized the school system needed a long-term solution to their roofing problems and was able to successfully recommend the implementation of the Atlas Certified Drainage Program (CDP™).

CDP is a comprehensive service for low slope tapered roofs designed to eliminate ponding water on a roof’s surface. The program’s designs help to prevent structural roof collapse, moisture invasion, membrane degradation, loss of thermal resistance, ice formation, vegetation growth and voiding system warranty. The Atlas CDP team worked on site with the MPS maintenance crew to map each roof in the school system and design custom drainage solutions specific to every individual building. While some building materials manufacturers will give a 25-year warranty, CDP ensures positive slope and drainage, which helps extend the life of the roof beyond a typical warranty. With proper maintenance and care, the MPS roofing system can last for 40 years.

 

 

By utilizing the Atlas Roofing Corporation’s Certified Drainage Program, the Milwaukee Public School System team saved on time and labor in addition to extending the life of each roof by at least 10–15 years, and in some cases more than 20. In fact, before implementing the CDP system, each school was only getting 20, 15 or as few as 10 years out of a roofing surface. Now the MPS team expects their roofs to last at least 30 years. According to the team, since implementing this system over 20 years ago, they still have yet to replace a roof with the new CDP system installed.

While maintenance is still required, the number of repairs needed is reduced each year. Before utilizing the CDP, the MPS team would find 200–400 leaks to inspect after rain and now, they are dealing with an average of only 20–30 leaks per building, of which only a fraction are leaks caused by the roof. The MPS team is incredibly proud of the program’s success and of the unprecedented support from Atlas Roofing Corporation. According to the MPS team, “You’d hardly know these roofs are 20 years old… they look good as new.”

To read the full case study, please visit http://www.atlasrwi.com/casestudies/mps/

Tags

Related Stories

| Jan 31, 2012

AIA CONTINUING EDUCATION: Reroofing primer, in-depth advice from the experts

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Dec 27, 2011

Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola

Topping off ceremony held on 238th Anniversary of Boston Tea Party.

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

| Dec 14, 2011

Tyler Junior College and Sika Sarnafil team up to save energy

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 17, 2011

Aerialogics announces technology partnership with CertainTeed Corp.

  CertainTeed to provide Aerialogics’ Aerial Measurement Services to its credentialed contractor base and utilize the technology in its Roofing Products Division.

boombox1
boombox2
native1

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021