When Dennis Fula took over responsibility for the Milwaukee Public School System’s (MPS) roof maintenance more than twenty years ago, many of the school buildings were threatened with closure due to unsafe conditions. Determined to ensure the city’s students had safe roofs over their heads, Dennis partnered with Dan Dalle Nogare and the team at Atlas Roofing Corporation to solve those safety concerns, reduce maintenance costs and extend the life of the historic school buildings.
Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students. After years of wear and tear from the harsh Wisconsin winters, the buildings’ roofs were in terrible shape, with some in threat of condemnation. Previously, the maintenance department had used short-term fixes by adding material to leaky roofs, ultimately worsening problems throughout the entire building network. Dennis realized the school system needed a long-term solution to their roofing problems and was able to successfully recommend the implementation of the Atlas Certified Drainage Program (CDP™).
CDP is a comprehensive service for low slope tapered roofs designed to eliminate ponding water on a roof’s surface. The program’s designs help to prevent structural roof collapse, moisture invasion, membrane degradation, loss of thermal resistance, ice formation, vegetation growth and voiding system warranty. The Atlas CDP team worked on site with the MPS maintenance crew to map each roof in the school system and design custom drainage solutions specific to every individual building. While some building materials manufacturers will give a 25-year warranty, CDP ensures positive slope and drainage, which helps extend the life of the roof beyond a typical warranty. With proper maintenance and care, the MPS roofing system can last for 40 years.
By utilizing the Atlas Roofing Corporation’s Certified Drainage Program, the Milwaukee Public School System team saved on time and labor in addition to extending the life of each roof by at least 10–15 years, and in some cases more than 20. In fact, before implementing the CDP system, each school was only getting 20, 15 or as few as 10 years out of a roofing surface. Now the MPS team expects their roofs to last at least 30 years. According to the team, since implementing this system over 20 years ago, they still have yet to replace a roof with the new CDP system installed.
While maintenance is still required, the number of repairs needed is reduced each year. Before utilizing the CDP, the MPS team would find 200–400 leaks to inspect after rain and now, they are dealing with an average of only 20–30 leaks per building, of which only a fraction are leaks caused by the roof. The MPS team is incredibly proud of the program’s success and of the unprecedented support from Atlas Roofing Corporation. According to the MPS team, “You’d hardly know these roofs are 20 years old… they look good as new.”
To read the full case study, please visit http://www.atlasrwi.com/casestudies/mps/.
Related Stories
| Oct 5, 2011
GREENBUILD 2011: Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance.
| Sep 27, 2011
Steel Joist Institute announces October webinar on Open Web Steel Joists
Webinar participants can earn 0.15 CEUs or 1.5 PDHs.
| Sep 14, 2011
USGBC L.A. Chapter's Green Gala features Jason McLennan as keynote speaker
The Los Angeles Chapter of the nonprofit USGBC will launch its Sustainable Innovation Awards this year during the chapter's 7th Annual Green Gala on Thursday, November 3.
| Sep 12, 2011
PVs play new roles as a teaching tool
Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.
| Sep 12, 2011
Putting a stamp on USPS's first green roof
The Morgan Building roof totals 150,000-sf. In addition to a vegetated green roof, other roof areas were upgraded and included 55,000-sf of reflective concrete pavers and ballast, which were also placed over a Sarnafil waterproofing membrane, and 40,000-sf of EnergySmart Roof—a reflective, energy-efficient vinyl roofing system from Sika Sarnafil.
| May 10, 2011
Sika Sarnafil introduces new roofing coating for existing roofs
Sika Sarnafil announced the availability of Sikacoat roof coatings, the latest addition to the company’s roofing product line and an economical solution to extend the life of existing roofing systems until a roof replacement is necessary. The Sikacoat roof coatings can be used over existing single ply roofing membranes, asphalt roof systems or metal roof systems.
| Apr 13, 2011
National Roofing Contractors Association revises R-value of polyisocyanurate (ISO) insulation
NRCA has updated their R-value recommendation for polyisocyanurate roof insulation with the publication of the 2011 The NRCA Roofing Manual: Membrane Roof Systems.