flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

Mixed-Use

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

The project will bring 160 affordable housing units to the area.


By David Malone, Associate Editor | May 7, 2021

Vital Brookdale, a new mixed-use residential development in Brooklyn’s Brownsville neighborhood, has topped out. The project includes 160 affordable housing units and approximately 25,000-sf of health-focused community space.

The project comprises studios, one-bedroom, two-bedroom, and three-bedroom units with 133 of the apartments reserved for households earning between 30% and 60% of area median income and 26 units earning 80% area median income. In addition to the apartment units, Vital Brookdale will also include resources that promote health and wellness, job training, outdoor green space, and opportunities for recreation.

A second-floor terrace and front and rear courtyards will include landscaping, a dog run, a play area, and active and passive recreation and seating areas. Additional amenities will include building-wide Wi-Fi, a multipurpose community room, a game room, a library/resident co-working space, a fitness room, a laundry room, cold-storage locker and package rooms, and a bike storage room.

In pursuit of Passive House Institute US + 2015 certification for the residential component, the project will include a 100kW roof-mounted solar photovoltaic system, high performance mechanical systems, insulation and windows, LED lighting, and low-flow water fixtures.

The Vital Brookdale project team comprises MDG Design + Construction, Smith & Henzy Advisory Group, The New York Foundling, Monadnock Construction, Dattner Architects, Skyline Engineering, DeNardis Engineering, Starr Whitehouse, and Bright Power.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021