flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use, mixed-income development under construction in Salt Lake City

Mixed-Use

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.


By David Malone, Associate Editor | March 22, 2021
225 South Slate Street ground level

Renderings courtesy KTGY Architecture + Planning

Construction has commenced at 225 South Slate Street in downtown Salt Lake City, a 190-unit, mid-rise and high-rise, mixed-use community. The transit-oriented development will add affordable housing, commercial tenants, non-profit arts organizations, a food hall, an event space, and live-work units to enhance the city’s downtown business district.

The development comprises two towers, one rising eight stories and one rising 12. The 190 residential units are split between the towers with 168 units designated affordable for renters earning between 20% and 80% of the area median income. The units will include a mix of studio, one-, two-, three-, and four-bedroom apartments. Two at-grade artist live-work spaces are also included and will allow the development to appeal to young professional singles and families alike.

 

225 South Slate Street in Salt Lake City

 

The two mixed-use buildings are connected by an open-air paseo that connects them to the new development to the adjacent commercial uses, including a coffee shop, a record store, and neighborhood creative office space. “Commercial tenants, event space, food hall and live-work units will line the paseo on the ground floors, while the residential units are located on the upper levels. The food hall, which is unique to the community, will draw lunch-time workers during the day and urban dwellers at night,” said Keith McCloskey, LEED AP, Associate Principal, KTGY, in a release.

The eight-story tower will utilize standard construction techniques and materials while the 12-story tower will leverage a steel structural system by Infinity Structures aimed at shortening the overall construction timeline and achieving more affordable construction costs. Construction for the entire project is estimated to take 24 months.

 

225 South Slate Street paseo

 

225 South Slate Street aerial

Tags

Related Stories

Mixed-Use | Nov 5, 2018

44-acre mixed-use project completes in Northridge, Calif.

Ware Malcomb designed the project.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

Wood | Oct 19, 2018

Design revealed for mass-timber residential tower in Milwaukee

The developer is confident that the city will approve construction, which is scheduled to start next year.

Mixed-Use | Oct 4, 2018

Four-story hotel and adjacent affordable housing community opens in California’s Sonoma County

Axis/GFA Architecture and Design was the architect for the project.

Mixed-Use | Sep 25, 2018

Dexter Yard to provide Seattle with 540,000 sf of mixed-use space

SkB Architects designed the development.

Mixed-Use | Sep 14, 2018

Six-story structure combines a parking garage with street-level retail

Eskew+Dumez+Ripple designed the structure.

Reconstruction & Renovation | Aug 22, 2018

Former shopping mall becomes mixed-use urban complex in Beijing

Schmidt Hammer Lassen Architects designed the project.

Mixed-Use | Aug 13, 2018

Florida mixed-use development uses wellness as the backbone of its design

Zyscovich Architects designed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021