flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use, mixed-income development under construction in Salt Lake City

Mixed-Use

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.


By David Malone, Associate Editor | March 22, 2021
225 South Slate Street ground level

Renderings courtesy KTGY Architecture + Planning

Construction has commenced at 225 South Slate Street in downtown Salt Lake City, a 190-unit, mid-rise and high-rise, mixed-use community. The transit-oriented development will add affordable housing, commercial tenants, non-profit arts organizations, a food hall, an event space, and live-work units to enhance the city’s downtown business district.

The development comprises two towers, one rising eight stories and one rising 12. The 190 residential units are split between the towers with 168 units designated affordable for renters earning between 20% and 80% of the area median income. The units will include a mix of studio, one-, two-, three-, and four-bedroom apartments. Two at-grade artist live-work spaces are also included and will allow the development to appeal to young professional singles and families alike.

 

225 South Slate Street in Salt Lake City

 

The two mixed-use buildings are connected by an open-air paseo that connects them to the new development to the adjacent commercial uses, including a coffee shop, a record store, and neighborhood creative office space. “Commercial tenants, event space, food hall and live-work units will line the paseo on the ground floors, while the residential units are located on the upper levels. The food hall, which is unique to the community, will draw lunch-time workers during the day and urban dwellers at night,” said Keith McCloskey, LEED AP, Associate Principal, KTGY, in a release.

The eight-story tower will utilize standard construction techniques and materials while the 12-story tower will leverage a steel structural system by Infinity Structures aimed at shortening the overall construction timeline and achieving more affordable construction costs. Construction for the entire project is estimated to take 24 months.

 

225 South Slate Street paseo

 

225 South Slate Street aerial

Tags

Related Stories

Mixed-Use | Jul 17, 2018

Water Street Tampa’s developer reveals details about this project’s public spaces

This $3 billion waterfront neighborhood will also include three hotels.

Urban Planning | Jul 6, 2018

This is Studio Gang's first design project in Canada

The building’s hexagonal façade will provide passive solar heating and cooling.

Multifamily Housing | May 30, 2018

Concentrated redevelopment: Apartment complex takes mixed use to the next level

An “intergenerational” mixed-use apartment complex may be a prototype for reenergizing neglected neighborhoods in America’s largest county.

Adaptive Reuse | Apr 26, 2018

Edison Lofts building is New Jersey’s largest non-waterfront adaptive reuse project

Minno & Wasko Architects & Planners designed the building.

High-rise Construction | Apr 17, 2018

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

The tower would be the second tallest in the city.

Mixed-Use | Apr 4, 2018

Shenzhen’s Mawan Mile master plan will include a ‘boulevard in the sky’

HASSELL won a competition to design the new mixed-use district.

Multifamily Housing | Feb 22, 2018

Multifamily building with 25,000 sf of amenities rises on the shore of the Potomac River

The building is part of the National Gateway mixed-use development at Potomac yard.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021