flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use pieces supporting a master plan in North Carolina fall into place

Mixed-Use

Mixed-use pieces supporting a master plan in North Carolina fall into place

Near Chatham Park, a new multifamily housing community follows the opening of a shopping center.


By John Caulfield, Senior Editor | October 5, 2023
An aerial view of Northwood Landing in North Carolina
An aerial view of Northwood Landing in North Carolina, a mixed-used development adjacent to the Chatham Park master-planned community. Images; Courtesy of Lee Moore Capiral

On September 7, Carolina Commercial Contractors, in collaboration with Lee Moore Capital Company, broke ground  on Medley Northwood Landing, a 312-unit garden apartment community in Pittsboro, N.C.

The 92-acre Northwood Landing is also home to a 62,000-sf shopping center anchored by a 44,000-sf Lowes Foods supermarket. The shopping center, which opened last June, has 10 outparcels for commercial and retail use, five of which have been leased by tenants that include national brands Dunkin’ and Zaxby’s.

Northwood Landing is across U.S. 501 from MOSAIC, a 44-acre $180 million entertainment and lifestyle destination that is also a gateway to the 8,500-acre Chatham Park master-planned community that is slated to have 22,000 homes and 22 million sf of constructed space. Chatham Park, which began construction in 2014 with the UNC Medical office building, is projected to be completed by 2040. (Preston Development Company, Chatham Park’s developer, also controls 1,000 adjacent acres that could be used for future expansion.)

A 62,000-sf retail center that's part of Northwood Landing
A shopping center in the heart of Northwood Landing is anchored by a Lowes Food supermarket.

Currently, Chatham Park has homes for sale in MOSAIC (condos and apartments), and in Vineyards, where 11 single-family and townhome builders are actively selling houses. A third community under development, called Encore, will be Chatham Park’s first active-adult-targeted neighborhood.

Combined with Northwood Landing, MOSAIC, and Penguin Place (another three-building 14,000-sf retail and restaurant space that debuted in 2017), Chatham Park will have 2 million sf of commercial area.

A growing market in need of housing

Two 36-apartment buildings at Medley are under construction and scheduled for completion by next spring. When Medley is built out, it will include 112 one-bedroom, 165 two-bedroom, and 36 three-bedroom apartments. Among its amenities are include garage parking, a pool pavilion with sundeck, a fitness center, golf simulator, and onsite staff and maintenance.
 

The site at Northwood Landing where Medley's garden apartments are being built. In the top left of the photo is visible multifamily housing available for rental at MOSAIC. Below, a rendering of what Medley Northwood Landing's multifamily homes will look like.

a rendering of Medley Northwood Landing

Along with Carolina Commercial Contractors, the Building Team for Medley has included CE Group (civil engineering), Sanford Contractors (horizontal construction), and Finley Design PA. Medley is being built in Chatham County, near the Raleigh-Durham metroplex, one of the fastest-growing counties in North Carolina. 

Of the 10 outparcels at Northwood Landing, three have been sold and are under development: Lot 5 (a 2,100-sf Dunkin’, a 4,849-sf First Health clinic, and 2,750-sf Haw River Veterinarian animal hospital); Lot 4 (a 3,162- ft, 72-seat Zaxby’s casual restaurant); and Lot 9 (Huby’s Car Wash).  Lot 3 also has a letter of intent to lease from Chase Bank, and a private school reportedly is considering renting one of the other lots. Several national retailers, quick-service restaurants, and service providers are looking at the balance of the sites.

Tags

Related Stories

Mixed-Use | Mar 21, 2017

Studio Gang commissioned to design its first Canadian building

The project will be a mixed-use tower at the southwest corner of Yonge and Delisle in Toronto.

Retail Centers | Mar 9, 2017

When everyone shops online, what happens to mixed-use retail?

NBBJ’s David Yuan explains how changing retail trends are creating new opportunities for urban experiences and public space. 

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021